Aug
19
to Sep 4

Hilton Resort Patio Remodel

 

BID DATE 9/4/19 at 3:00 PM

This project consists of a remodel of an exterior bar patio including removal and replacement of low site wall, addition of low site wall, ornamental iron gates, glass windscreen and new wood framed pergola.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found on Smartbid or using this link:

https://schipperconstruction.box.com/s/q8a7z133k60c4c7y8d1qax49pm6o25e6

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com) & Scott Jacobs (sjacobs@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, underground utilities, landscaping & landscape demolition, grading, concrete, masonry, ornamental iron (gates), structural steel, rough carpentry, glass & glazing, plastering, painting, staining, plumbing & electrical.

View Event →

Aug
2
to Aug 20

3516 State Street, Tenant Improvements

 

Bids Due: 8/20/2019 @ 02:00 PM

You can download a set of plans by going onto our SmartBid website or using this link:

                                     https://schipperconstruction.box.com/s/qibshp05li1howl5w9e6wkg2ew0knyug.

 Specifications are included on the G sheets.

 SCOPE OF WORK. Tenant Improvement (interior and exterior remodel) of 2,767 SF including: Concrete footings & slab patch, & ADA upgrades, soft demo, structural steel, light gage metal framing, rough & finish carpentry, millwork & countertops, insulation, roofing & roof screens, plaster patch, drywall, Doors/windows/hardware, roll up door, ceramic tile, bath accessories & partitions, Glass/glazing/skylights, acoustic ceilings, carpet & resilient flooring, painting, ADA signage, fire protection, plumbing, HVAC new rooftop units, HVAC distribution & controls, electrical & PV.  Civil to include seal and stripe existing lot, site lighting, security & landscaping. Fire Sprinklers and Photovoltaic systems are included as deferred submittals.

 This project is  NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jul
29
to Aug 15

Santa Barbara Plaza Improvements - Natural Grocer at 29 S. Milpas

 

BIDS 8/15/19 at 3:00PM

Exterior improvements to the Shopping Center located at 29 S. Milpas known as Santa Barbara Plaza. The scope includes a new 606 square foot CMU loading room addition, new recessed loading dock, enclosed outdoor CMU storage area and trash enclosure, complete Facade remodel including framing a new Plaster Entry Tower with Ornamental Metal Screens, Reconstruction of Asphalt Parking Lot, Storm Drainage and Pavers, new Site Lighting and new Landscaping and Irrigation.

You can Download plans and Soils Report by going to our SmartBid Website or at the Subcontractor Center on our Website or at the link below.

https://schipperconstruction.box.com/s/68d1o6xzl9zifvn6asbrkasxz66k3fvr

Estimator: Phil Orr - phil@schipperconstruction.com

View Event →
Jul
17
to Jul 31

1125 & 1127 State St. 2nd Floor TI

 

THIS PROJECT BIDS on 7/31/2019 at 3:00pm

This is a tenant improvement to create to convert existing 2nd floor commercial office space into two residential units

The plans can be found on the smartbid link or the link below:
https://schipperconstruction.box.com/s/w00eun5ackw9e3sxh08zul9ztcpnie9k


The scope of work includes soft demolition, gypsum concrete, ornamental iron, rough carpentry, finish carpentry, cabinetry, roofing, insulation / icynene, sealants, skylights, doors frames hardware, drywall, ceramic tile, wood flooring, painting & staining, kitchen equipment, plumbing, HVAC & electrical.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

View Event →
Jul
1
to Jul 10

Hyatt Unbound

 

Hyatt Unbound

Bids Due: 7/10/2019 @ 03:00 PM

PROJECT DESCRIPTION. Remodel of the existing Restaurant with added bar w/ outdoor dining and lounge, expanded lobby & patio, pool bar & over 10,000 SF of meeting & private dining rooms. You can download a set of plans by going onto our SmartBid website or using this link:

https://schipperconstruction.box.com/s/lzki5t4wju1qb9r5ye8zxg75kuin160z

SCOPE OF WORK. Renovations including: selective demo, concrete, masonry, metals, light gage metal framing, rough framing, finish carpentry insulation, drywall, doors/frames & hardware, windows, glazing/mirrors, drywall, ceramic tile/stone, acoustic ceilings, carpet flooring, painting, interior specialties, Toilet/bath accessories, FF & E installation, roof patch, fire sprinkler, plumbing, HVAC, & electrical.  Civil to include selective demo, flatwork/curbs, permeable pavers, wood walkway, wood trellis, decorative fountain, concrete stairs, ADA upgrades, catch basins/storm drains, & bocce ball court. Landscaping of 15,400 SF to include selective demo, tree protection, landscape construction, Green Roof System, planting, irrigation & landscape lighting.

IMPORTANT NOTES.

1.)    Your Project Bid need to be broken down as shown on the Attachment J - PA Bid Form.

2.)    Pay close attention to the Attachment I – Responsibility Matrix which is also shown in more detail in the beginning the Material Specifications.

This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Phil Orr. Phil@schipperconstruction.com. (805) 963-4359 x 101

               Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jun
4
to Jun 18

Insomnia Cookies T.I.

 

Insomnia Cookies Improvements

430 State St., SB, Ca, 93101

Bids Due: 6/18/2019 @ 02:00 PM

Plans can be found using this link: https://schipperconstruction.box.com/s/57px020ge0fnwaoruy83dbjfl4rexvgl.

SCOPE OF WORK. Tenant Improvement of 1,414 SF retail bakery including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior door, frames & hardware, glazing at sidelights, acoustic ceilings, ceramic tile floor & base, painting,  plumbing, HVAC  and controls, & electrical.

 This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jun
4
to Jun 13

LAXMI Labs, Tenant Improvements

 

LAXMI Labs, Tenant Improvements

75 Aero Camino # 204, Goleta, CA. 93117

Bids Due: 6/13/2019 @ 03:00 PM

Link to plans: https://schipperconstruction.box.com/s/qkrunkjhlabri7rf7zyh4o52oztb44n1

SCOPE OF WORK. Tenant Improvement of 1,030 SF including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, lab casework, frames & hardware, glazing, acoustic ceilings, vinyl base flooring, painting, fire protection (sprinklers,) plumbing, HVAC and controls, & electrical.  Civil to include (2) new accessible parking stalls and a new sloped walkway and landing.

 This project is  NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
May
2
to May 15

H&R Investments (revised) REBID

 

This project consists of a 1500sf Restaurant Tenant Improvement to Suite 7 located in the upper level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

REVISED Plans can be found on Smartbid or using this link: https://schipperconstruction.box.com/s/0gwtr3jfim0p8lyln01iagbz9vg3y18i

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, rough carpentry, finish carpentry, cabinetry, countertops, insulation, FRP installation, roofing, doors frames hardware, glass & glazing, metal stud framing, drywall, acoustical ceilings, ceramic tile, painting, toilet accessories, lockers, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical. 

View Event →
May
2
to May 10

3 E De La Guerra HVAC

 

This project consists of new mechanical heating and cooling equipment for all of existing 2nd floor offices and first floor retail tenant.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found on Smartbid or using this link: https://schipperconstruction.box.com/s/y55sndtnii26k1yyki5f8itutmod4xc6

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, rough carpentry, finish carpentry, roof patching, drywall patching, painting, HVAC and electrical.

View Event →
Apr
25
to May 22

El Cap Milpas Mixed Use

This project consists of the following:  Demolition of 29,488 SF commercial and warehouse space and 1,330 SF of apartments. Construct an new 94,351 Gross SF Mixed Use Building consisting of 2,759 SF Commercial Space, 76 one and 2 bedroom Apartments plus community amenities including fitness center, roof top decks with fire pits and built-in BBQ, Rental Office and bike parking. Project also includes 88 parking spaces, on and off site improvements and the reconfiguration of one block of Ortega Street.  

Note the the lender (HUD) requires a separate Bid Price for Off-site Improvements. (see drawings G-1, C-1 through C-7 Offsite Work) Note that utilities trenching, taps to main utility lines and meters at back of property line shall be considered "On-site Costs" All other work outside of property line is considered "Off-site Costs". 
Please provide a separate cost for this Off-site work as part of your bid.

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/pyeajic8p3ix5qt7zb0evik6g8fuwxz9

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is a  PREVAILING WAGE
Davis Bacon Prevailing Wage Determination is included within the Project Manual (Specifications). 

FSCC Estimator: Phil Orr (phil@schipperconstruction.com

SCOPE OF WORK:

The scope of work includes Haz-Mat abatement, building and site demolition, site clearing, earthwork, On-site and Off-site improvements, utilities, site concrete, asphalt paving, Precast Pavers, metal fencing and gates, site furnishing, bike racks, landscape and irrigation, structural concrete, CMU and masonry veneer, structural and Misc. steel, metal stairs, railings, ornamental metal, rough carpentry and framing, cabinets, solid surfaces, waterproofing, sheet metal, gutters and downspouts, traffic coatings, building insulation, fiber cement siding, roof specialties, firestopping, expansion joint assemblies, doors, frames and hardware, fiberglass doors, overhead doors, aluminum storefronts, windows, lath and plaster, drywall, ceramic tile, resiliant flooring, carpet, painting, signage, wall and corner guards, toilet and bath accessories, fire extinguishers, metal and canvas awnings, residential appliances, Pre-fabricated metal structures, elevators, fire sprinklers, plumbing, HVAC, Electrical, Fire alarm.

View Event →
Apr
8
to Apr 23

Montecito Sanitary District Essential Services Building

 

Bids Due: 4/23/19  @ 12:00 PM

 You can download a set of plans by going onto our SmartBid website or using this link:

                                       https://schipperconstruction.box.com/s/ordoabvqujtlutbo05t789n5m3eahew7

 SCOPE OF WORK The project includes a new, single story, 5,085 net SF essential services building, new curb cut along Channel Drive, 17 space surface parking lot, 4 bike parking spaces, lighting and landscaping. Scope includes selective Site Demolition, Metal Fabrications, rough and finish Carpentry, Architectural Millwork, Insulation. Single Ply Membrane Roofing and Roofing Tiles, Wood doors & hardware,  Aluminum Storefronts, Skylights, interior finishes, light gage metal framing, Lath & Plaster, Ceramic tile, ADA signage, Toilet Accessories, Phenolic Lockers & benches, Postal Specialties, Residential Appliances, Engineered Quartz Countertops, Fire Protection, Plumbing, HVAC distribution & controls, & Electrical including Low Voltage.

   

This project is prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Feb
21
to Apr 4

SB Junior High School Heating System Replacement and MPR, Kitchen & Locker Room Building

 

Addendum Notice and BID EXTENSION

NEW Bid date: 4/4/19

THERE IS (1) ADDENDUM on this project. Please be sure to indicate you have seen it in your bid.

This bid is for (2) Separate Projects for the Santa Barbara Unified School District.  Each project has its own set of plans and specifications.  There is one DSA permit for both projects so one contract will be awarded for both projects.  The School District will require separate prices for each project.

Project 1:      Santa Barbara Junior High School Heating System Replacement.

 This project consists of the following:

1)    Demo of existing steam heating system and associated piping within the mechanical room

2)    Rerouting of new hot water supply and return lines from mechanical room to heaters throughout the existing classroom building

3)    The radiant heaters will be removed, refinished and placed back in their existing location

 

Project 2:      Santa Barbara Junior High School MPR, Kitchen & Locker Room Bldg.

 This project includes both demolition and new construction of a Multi-Purpose Room / Kitchen / Locker Room Building on an existing site in Santa Barbara, Ca.

 This project consists of the following:

1)    Demo of existing multipurpose room, kitchen and locker room buildings

2)    Building a New Type IIIB Building consisting of Multi-Purpose Room, Food Service and Locker Rooms

3)    New site work with accessible parking, hardscape, landscape, underground utilities, path of travel and lighting.

Plans can be found using the following link:

https://schipperconstruction.box.com/s/bblwrutgjxl8spdl5mktu5wcb5anwo1w


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next few weeks; we will notify you on when this jobwalk will occur

 

Please break out your bid based on the following:

 SBJHS Heating System Replacement                             $                                    

 SBJHS MPR, Kitchen & Locker Room                             $                                    

 

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  As of January 1, 2019, at least 50 percent of the skilled journeypersons employed to perform work on the contract or project by the entity and each of its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation that was either approved by the chief pursuant to Section 3075 of the Labor Code or located outside California and approved for federal purposes pursuant to the apprenticeship regulations adopted by the federal Secretary of Labor.

This is a DSA Project

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

SCOPE OF WORK for the Heating System Replacement is:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

 SCOPE OF WORK for the Multi-Purpose Room / Kitchen / Locker Room is:

The scope of work includes building demolition, site clearing, hard and soft demolition, hazardous material abatement, precast concrete piles, landscape & irrigation, asphalt paving, striping, site furnishings, chain link fencing & gates, underground utilities, underground storage tank removal, underslab vapor barrier, concrete rebar, cast in place concrete, structural steel, steel decking, metal fabrications, pipe and tube railings, rough carpentry, glu lams, architectural woodwork, countertops, , finish carpentry, insulation, clay tile roofing, membrane roofing, sheet metal roofing, flashing & sheet metal, roof accessories, firestopping, joint sealants, doors frames hardware, overhead rolling doors, storefront / windows / glass & glazing, tubular skylights, louvers, floor prep, drywall, lath & plaster, tile, acoustical ceilings, cementitious wood fiber ceilings, resilient flooring, fluid applied flooring, painting, high performance coatings, anti-graffiti coatings, signage, toilet partitions & accessories, fire extinguishers, lockers, food service equipment, basketball equipment, window shades (mechoshades), fire sprinkler system, plumbing, HVAC, electrical, communications, fire alarm.

View Event →
Feb
13
to Mar 4

Rancho Alegre Phase I

 

This project consists of the following:  Phase I rebuilding of one story wood framed buildings after damage in Whittier Fire.  The buildings consist of the following:

* (4) Dorm Buildings - 8520sf
* (1) Health Center Lodge - 1125sf
* (2) Outdoor School Staff Housing - 3510sf
* (3) 2-bedroom Staff Housing (no garage) -2400sf
* (2) 2-bedroom Staff Housing (with garage) - 1600sf
* (1) 3-bedroom Staff Housing - 1100sf


Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/39kp7ihp7mfefc78qj2xwk6pv1xlbodj

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs (sjacobs@schipperconstruction.com)
 
SCOPE OF WORK:
The scope of work includes foundation concrete, slab on grade concrete, masonry, rough carpentry, finish carpentry, cabinetry, insulation, SIPS Panels, waterproofing, metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead garage doors, windows, drywall, fiber cement siding, epoxy flooring, vinyl plank flooring, painting, staining, toilet accessories, fire extinguishers, signage, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical.

View Event →
Feb
8
to Feb 22

Restaurant TI at Coast Village Road

 

This project consists of a 1500sf Restaurant Tenant Improvement to Suite 7 located in the upper level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found on Smartbid or using this link: https://schipperconstruction.box.com/s/vgnkz3whwukw9ewq92a0ih22dd8hzqgr


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, rough carpentry, finish carpentry, cabinetry, countertops, insulation, FRP installation, roofing, doors frames hardware, glass & glazing, metal stud framing, drywall, acoustical ceilings, ceramic tile, painting, toilet accessories, lockers, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical. 

View Event →
Jan
29
to Feb 19

421 Pine Ave T.I.

 

You can download a set of plans by going onto our SmartBid website or using this link: https://schipperconstruction.box.com/s/50bhn0ieik4ishtplpohu5zmc2ccrnjy

SCOPE OF WORK. Tenant Improvement of 7,904 SF including: Exterior concrete flatwork, & ADA upgrades, soft demo, interior finishes, light gage metal framing, rough framing at new skylights, finish carpentry, millwork & countertops, minor structural steel for countertop reinforcement, insulation, roof patch, drywall, interior doors, frames & hardware, ceramic tile, bath accessories & partitions, Glass/glazing/skylights, acoustic ceilings, carpet & resilient flooring, painting, ADA signage, fire protection, plumbing, HVAC new rooftop unit, HVAC distribution & controls, & electrical.

 This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jan
21
to Feb 11

Carpinteria City Hall Renovations T.I. 5775 Carpinteria Ave

 

You can download a set of plans by going onto our SmartBid website or using this link:

                                      
https://schipperconstruction.box.com/s/slj8s78hrz7dnlzsmkmjax6bm1ybwpnb

 

 SCOPE OF WORK.  Interior/exterior renovations of an existing 11,000 sf single story building in downtown Carpinteria consisting of: site & architectural concrete, unit pavers, underground utilities, landscaping, site furnishings, soft & hard demo, interior finishes, light gage metal framing, wood framing, structural steel,  aluminum handrails, insulation, roof patch, drywall, interior doors, frames & hardware, acoustic ceilings & suspended wood ceilings, doors & hardware, millwork/cabinets & countertops, glass & glazing, carpet & vinyl flooring, painting, ceramic tile, ADA signage, toilet partitions & accessories, metal roofing and insulation, fire protection & alarm, plumbing, HVAC & controls, & electrical.

ARCHITECTS PROJECT DESCRIPTION: Description: Interior TI. Accessibility upgrades, remediation of sewer backup damage. Removal of vinyl asbestos tile by owner.

 This project is prevailing wage. DIR # is required w/ bid.

 MBW / WBE / DVBE Contractors are encouraged to bid

Last day to submit RFIs is January 25, 2019.

 

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

View Event →
Jan
21
to Feb 8

Fleishmann Auditorium Refresh

 

The project involves the Refresh of the approximate 7,900 square foot Fleishmann Auditorium at the Santa Barbara Museum of Natural History. The scope of work includes selective demolition, landscaping, misc. carpentry, Misc. Metal and railing, new clay tile and PVC roofing, sheet metal, doors and hardware, mirrors, new window film, drywall, acoustical treatments, patch and refinish wood flooring, carpeting, painting, new stage curtain, roller shades, new Wheel Chair Lift, removal and replacement of existing HVAC, electrical, and lighting.

Link to the plans below.

https://schipperconstruction.box.com/s/6fcf2vnpq3vfnif1euuzl26aovsnm0ni

View Event →
Jan
8
to Jan 16

Tapjoy/Cameron Pacific Tenant Improvements

 

Bids Due: 1/29/2019 @ 02:00 PM

 

THIS PROJECT BIDS on 1/29/2019 at 2:00pm

This is a tenant improvement to create offices for Tapjoy/Cameron Pacific & will combine Suites A10-14 into one suite. Tenant improvements consist of three offices, conference room, break room, and copy room. Interior improvements only.


The scope of work includes soft demolition, finish carpentry, cabinetry & countertops, insulation, doors frames hardware, metal stud framing & drywall, acoustic ceiling, glass/glazing, ceramic tile & stone, PL countertops, Caesar-stone countertops, carpet/flooring, LVT flooring and base, painting, fire sprinkler relocation, plumbing, HVAC and electrical.

You can download a set of plans by going onto our SmartBid website or using this link:        https://schipperconstruction.box.com/s/158msjtirggpid0r284x04ohfm18tucx.

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Dec
27
to Jan 22

Lompoc Extraction Lab

 

THIS PROJECT BIDS  on 1/22/19 at 3:00pm

This project consists of the following:

Development of a Cannabis Extraction Lab in the interior of an existing building. 

Please note that there are Two Phases on the plans and bids will have to be priced accordingly 
(Phase I $_______ Phase II $_______)



If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

https://schipperconstruction.box.com/s/p0v7h2xugqfb199lhqemi5y3vv0l06d9


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, surveying, misc. site clearing, tree removal, tree pruning, road base installation, site concrete, parking lot striping, truncated domes, site signage, concrete footings & slab, heavy duty metal framing, structural steel, metal decking, rough carpentry, finish carpentry, cabinetry, insulation, doors frames hardware, windows, metal stud framing, drywall / sureboard, acoustical ceilings, painting, signage, lockers, kitchen equipment, pre engineered metal building rework, plumbing, HVAC, Electrical, security.

View Event →
Dec
17
to Jan 4

Cameron Pacific Tenant Improvements

 

THIS PROJECT BIDS  on 12/27/18 at 2:00pm

This project consists of the following:

This is a tenant improvement to create offices for Cameron Pacific.  Please see the revised layout where there are (4) Private Offices and an Open Office.  The conference room shown on A2.1 has been deleted.  Acousitcal ceilings will no longer be needed as the Owner has elected use R30 Insulation with Black Scrim Paper for the ceiling.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

https://schipperconstruction.box.com/s/hjtgukr1gnka8090x2jrlgqd1fpdgk3k

PLEASE SEE THE ATTACHED OWNER SCOPE SHEET FOR A MORE DETAILED DESCRIPTION OF THE WORK

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, finish carpentry, cabinetry & countertops, insulation, doors frames hardware, metal stud framing & drywall, flooring, painting, fire sprinkler relocation, plumbing, HVAC and electrical.

View Event →
Dec
11
to Jan 4

Intuitive Surgical Tenant Improvements

 

Bids Due: 12/21/18 @ 02:00 PM

You can download a set of plans by going onto our SmartBid website or using this link:

                                       https://schipperconstruction.box.com/s/lsmj4ddb30k5azt93jj022d8ryipx7jj

 

SCOPE OF WORK. Tenant Improvement of 4,836 SF including: soft demo, interior finishes, light gage metal framing, minor structural steel for purlin reinforcement, insulation, roof patch, drywall, interior doors, frames & hardware, acoustic ceilings, carpet flooring, painting, ADA signage, fire protection, plumbing, HVAC new rooftop unit w/ screening, HVAC distribution & controls, & electrical.

 This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Dec
5
to Dec 12

Sunburst Winery

Remodel of an existing 1,320 commercial building to create a new Wine Tasting Room. Project includes the interior remodel including a kitchen, walk-in cooler, Service Bar, Retail Area, new accessible restroom. Exterior improvements include new deck with fire pit, handicap ramp, new landscaping and repave and stripe parking lot. 
Project scope includes demolition, asphalt paving and striping, concrete, steel, cablerail, framing, sheet metal, FRP{, drywall, plaster cabinets and countertops, solid surfaces, acoustical ceilings, wood flooring, tile, epoxy flooring, paint, doors, overhead door, windows, toilet accessories, Plumbing, HVAC, Electrical Kitchen and Bar Equipment.

Plans can be found on the following link: https://schipperconstruction.box.com/s/ovznswk7o7wgd50vv95kpk2iww6nosp3

View Event →
Nov
15
to Jan 16

SB MTD Transit Center Renovation

This project consists of the following:  Overhaul an existing 15,200 sf site in downtown Santa Barbara consisting of improvements of a single story concrete block, metal and glass building with metal roofing; replacement of a concrete loading platform and driveway surface; new underground utility services and site lighting; all new landscaping; temporary facilities; and offsite improvements including new sidewalk, curb & gutter.

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/i8scn5hpkp53r119x55h9b8i2wjh8eyw

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Phil Orr (phil@schipperconstruction.com

SCOPE OF WORK:

The scope of work includes hard and soft demolition, haz mat abatement, site concrete, brick paving, landscaping, slab on grade concrete, architectural concrete, metal fabrication, rough carpentry, finish carpentry, architectural woodworking, TPO Roofing, waterproofing, metal wall panels, batten seam metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead coiling door, storefronts / glazing, metal stud framing & drywall, plaster, tile, acoustical ceilings, carpeting, sound absorbing ceilings, painting, staining, high performance coatings, toilet partitions / accessories, fire extinguishers / cabinets, solid plastic lockers, cubicle tracks & curtains, outdoor furniture, fire sprinklers, plumbing, HVAC, electrical, fire alarm, data, communications, security.

View Event →
Sep
13
to Sep 21

Rosewood Miramar TI

 

THIS PROJECT BIDS  on 9/21/18 at 3:00pm

This project consists of the following:

Tenant Improvement of (E) 1925sf Guest Services Retail Building (mercantile) with 136sf Covered Porch

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/7yjnkjjkqtnswdc6egpw7r2wfvx7i216

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, cabinetry / woodworking, rough carpentry, finish carpentry, insulation, doors, frames, hardware, mirrors, concrete topping for flooring, rubber topset base, painting, ceiling access panels, signage, curtains, fire sprinklers, plumbing, HVAC, Electrical.

View Event →
Sep
13
to Oct 2

HERBAY PHARMACY T.I.

 

HERBAY PHARMACY T.I.

5340 Hollister Ave, Suite A

Goleta, CA 93111

 Bids Due: 10/2/18 @ 02:00 PM

  

  You can download a set of plans by going onto our SmartBid website or using this link:     https://schipperconstruction.box.com/s/p5v98jgs5ucxmqfxdy8ame748bvshp2c

 

SCOPE OF WORK. Tenant Improvement of 2,482 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, flooring, glass glazing, acoustic ceilings, painting, plumbing, HVAC distribution and controls, & electrical.

 

This project is  NOT prevailing wage

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
10
to Sep 18

St. Louis de Montfort Church Exterior ramps, Vestibule renovations

 

You can download a set of plans by going onto our SmartBid website or using this link:                                        https://schipperconstruction.box.com/s/hzhrd11vhoxv2mqgemra3r06byf03rla

 SCOPE OF WORK. Exterior replacement of existing non-compliant concrete ramps with new accessible concrete ramps, stairs, curbs and pipe guardrails/handrails. Interior vestibule renovations of 900 SF including: soft demo, interior finishes, wood framing (remodel), drywall/plaster patch, interior doors renovation, door hardware, aluminum windows, ceramic tile/stone, Veristone trim, painting, electrical, landscape repair and landscape lighting.

 This project is  NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
6
to Sep 18

9 E Pedregosa

 

Here is some of the project information. It includes, but is not limited to:

SCOPE OF WORK. Tenant Improvement of 2,770sf including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, frames & hardware, acoustic ceilings, flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

Plans are available at this link: https://schipperconstruction.box.com/s/y5hgfmcdim8062fugsm42g8llcf8iwoo or from our SmartBid website. 

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com . We will have a hard copy set of plans in our plan room

Please direct all questions and RFIs to arlan@schipperconstruction.com

You can respond by clicking on one of the links above to let us know your intentions.

If you have any questions regarding this project, please contact me.

View Event →
Aug
31
to Sep 11

Fairview Shopping Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/3ibv82c38b4hbz75rqjlswpeqa1tw38u

SCOPE OF WORK. Exterior refresh of shopping center to include parking lot slurry seal, curb repainting and re-striping; prepare and repaint of 7 existing buildings plus monument signage, clock signs and trash enclosures. All shopping center tenants to remain open during construction. Coordinate the work with all loading and delivery schedules for the tenants. Provide customer pedestrian and traffic control to protect the areas of work, shopping center patrons and vehicles. Landscaping to remove existing climbing vines. Clean the prefinished metal surfaces per manufacturer’s recommendations (no power washing.) Clean and power  wash existing colored block to remain.

This project is  NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Aug
22
to Sep 13

Funk Hostel @ 134 Chapala St

 

This project consists of the following:

* Tenant improvements to interior of existing commercial building (no change of use or square footage added)
* Renovate existing mechanical, electrical & plumbing
* Replace all exterior doors and windows in place.  Remove existing windows and doors
* Repair / replace existing exterior fabric awnings
* Replaster exterior of existing building
* Restripe existing ADA Parking space for van access

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found using this link:  https://schipperconstruction.box.com/s/nc8sbr8tjnuagfsrtxpx3igm3tijst1j

Please see the attached bid form indicating which items are alternates

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, masonry, misc. metals (awnings), rough carpentry, finish carpentry, cabinetry / millwork, insulation, roofing, sheet metal, storefront entry, doors frames & hardware, plaster, drywall, concrete floor seal, tile & stone, painting & staining, toilet partitions / accessories, signage, fire extinguishers, bike racks, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
24
to Aug 21

El Prado - La Quinta Inn & Suites

 

This project consists of converting an existing 3-story, 56 Room Hotel to a remodeled / new 3-Story, 122 Room Hotel with with a pool/spa courtyard area at the ground floor and one sub-grade basement parking level connecting to the existing garage.  The new Hotel will have 124 parking spaces, new lobby, dining, kitchen and exercise rooms.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction. We will have a hard copy set of plans in our plan room

Electronic Plans can be found using this link: https://schipperconstruction.box.com/s/km3ko01r327a4jumla0zcucinz1rw6ls

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com) & Phil Orr (phil@schipperconstruction.com)

The scope of work includes earthwork and site clearing, hard and soft demolition, underground utilities, landscape & irrigation, tower crane, shoring, scaffolding, fencing, site concrete, pavers, wood decking, gravel pathway, tree grates / misc. metals, water features, pool & spa, synthetic turf, bike racks, ceramic pots, a green roof (live roof), tree relocation & removal, SWPPP, surveying, foundation / slab / wall & deck concrete, lightweight concrete, CMU & GFRC / Precast, structural steel, prefabricated stairs, handrails, ornamental iron, glass railing, rough carpentry, finish carpentry, cabinetry / millwork, solid surfaces, sheet metal, waterproofing, insulation, TPA roofing, pedestal pavers, doors frames hardware, storefront / windows, skylights, smoke curtains, lath & plaster, metal stud framing & drywall, ceramic tile, acoustical ceilings, vinyl & carpet flooring, sealed concrete floors, wood flooring, painting, wall covering, toilet partitions & accessories, misc. specialties, food service equipment, laundry equipment, elevator, fire sprinklers, plumbing, HVAC, electrical / low voltage.

View Event →
Jul
23
to Aug 6

5340 Hollister Ave. Tenant Improvements

 

This project consists of the following:

Remodel of existing 2271sf tenant space in (E) 4791sf building.   This project includes the installation of a demising wall to create two separate units, new ADA restrooms, HVAC Equipment, plumbing and electrical fixtures, new finishes in Suite 101 and new ADA Parking Signage.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans for this project can be found here: https://schipperconstruction.box.com/s/9s7gg0fli7lknm5geftjdd9lon4xycvm

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, rough carpentry, finish carpentry, insulation, roof patching, sheet metal, storefront entry, doors frames & hardware, metal stud framing, drywall, sheet vinyl flooring, acoustical ceilings, painting & staining, toilet partitions / accessories, signage, fire extinguishers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →