Dec
5
to Dec 12

Sunburst Winery

Remodel of an existing 1,320 commercial building to create a new Wine Tasting Room. Project includes the interior remodel including a kitchen, walk-in cooler, Service Bar, Retail Area, new accessible restroom. Exterior improvements include new deck with fire pit, handicap ramp, new landscaping and repave and stripe parking lot. 
Project scope includes demolition, asphalt paving and striping, concrete, steel, cablerail, framing, sheet metal, FRP{, drywall, plaster cabinets and countertops, solid surfaces, acoustical ceilings, wood flooring, tile, epoxy flooring, paint, doors, overhead door, windows, toilet accessories, Plumbing, HVAC, Electrical Kitchen and Bar Equipment.

Plans can be found on the following link: https://schipperconstruction.box.com/s/ovznswk7o7wgd50vv95kpk2iww6nosp3

View Event →

Nov
15
to Dec 6

SB MTD Transit Center Renovation

This project consists of the following:  Overhaul an existing 15,200 sf site in downtown Santa Barbara consisting of improvements of a single story concrete block, metal and glass building with metal roofing; replacement of a concrete loading platform and driveway surface; new underground utility services and site lighting; all new landscaping; temporary facilities; and offsite improvements including new sidewalk, curb & gutter.

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/i8scn5hpkp53r119x55h9b8i2wjh8eyw

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Phil Orr (phil@schipperconstruction.com

SCOPE OF WORK:

The scope of work includes hard and soft demolition, haz mat abatement, site concrete, brick paving, landscaping, slab on grade concrete, architectural concrete, metal fabrication, rough carpentry, finish carpentry, architectural woodworking, TPO Roofing, waterproofing, metal wall panels, batten seam metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead coiling door, storefronts / glazing, metal stud framing & drywall, plaster, tile, acoustical ceilings, carpeting, sound absorbing ceilings, painting, staining, high performance coatings, toilet partitions / accessories, fire extinguishers / cabinets, solid plastic lockers, cubicle tracks & curtains, outdoor furniture, fire sprinklers, plumbing, HVAC, electrical, fire alarm, data, communications, security.

View Event →
Sep
13
to Sep 21

Rosewood Miramar TI

 

THIS PROJECT BIDS  on 9/21/18 at 3:00pm

This project consists of the following:

Tenant Improvement of (E) 1925sf Guest Services Retail Building (mercantile) with 136sf Covered Porch

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/7yjnkjjkqtnswdc6egpw7r2wfvx7i216

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, cabinetry / woodworking, rough carpentry, finish carpentry, insulation, doors, frames, hardware, mirrors, concrete topping for flooring, rubber topset base, painting, ceiling access panels, signage, curtains, fire sprinklers, plumbing, HVAC, Electrical.

View Event →
Sep
13
to Oct 2

HERBAY PHARMACY T.I.

 

HERBAY PHARMACY T.I.

5340 Hollister Ave, Suite A

Goleta, CA 93111

 Bids Due: 10/2/18 @ 02:00 PM

  

  You can download a set of plans by going onto our SmartBid website or using this link:     https://schipperconstruction.box.com/s/p5v98jgs5ucxmqfxdy8ame748bvshp2c

 

SCOPE OF WORK. Tenant Improvement of 2,482 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, flooring, glass glazing, acoustic ceilings, painting, plumbing, HVAC distribution and controls, & electrical.

 

This project is  NOT prevailing wage

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
10
to Sep 18

St. Louis de Montfort Church Exterior ramps, Vestibule renovations

 

You can download a set of plans by going onto our SmartBid website or using this link:                                        https://schipperconstruction.box.com/s/hzhrd11vhoxv2mqgemra3r06byf03rla

 SCOPE OF WORK. Exterior replacement of existing non-compliant concrete ramps with new accessible concrete ramps, stairs, curbs and pipe guardrails/handrails. Interior vestibule renovations of 900 SF including: soft demo, interior finishes, wood framing (remodel), drywall/plaster patch, interior doors renovation, door hardware, aluminum windows, ceramic tile/stone, Veristone trim, painting, electrical, landscape repair and landscape lighting.

 This project is  NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
6
to Sep 18

9 E Pedregosa

 

Here is some of the project information. It includes, but is not limited to:

SCOPE OF WORK. Tenant Improvement of 2,770sf including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, frames & hardware, acoustic ceilings, flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

Plans are available at this link: https://schipperconstruction.box.com/s/y5hgfmcdim8062fugsm42g8llcf8iwoo or from our SmartBid website. 

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com . We will have a hard copy set of plans in our plan room

Please direct all questions and RFIs to arlan@schipperconstruction.com

You can respond by clicking on one of the links above to let us know your intentions.

If you have any questions regarding this project, please contact me.

View Event →
Aug
31
to Sep 11

Fairview Shopping Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/3ibv82c38b4hbz75rqjlswpeqa1tw38u

SCOPE OF WORK. Exterior refresh of shopping center to include parking lot slurry seal, curb repainting and re-striping; prepare and repaint of 7 existing buildings plus monument signage, clock signs and trash enclosures. All shopping center tenants to remain open during construction. Coordinate the work with all loading and delivery schedules for the tenants. Provide customer pedestrian and traffic control to protect the areas of work, shopping center patrons and vehicles. Landscaping to remove existing climbing vines. Clean the prefinished metal surfaces per manufacturer’s recommendations (no power washing.) Clean and power  wash existing colored block to remain.

This project is  NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Aug
22
to Sep 13

Funk Hostel @ 134 Chapala St

 

This project consists of the following:

* Tenant improvements to interior of existing commercial building (no change of use or square footage added)
* Renovate existing mechanical, electrical & plumbing
* Replace all exterior doors and windows in place.  Remove existing windows and doors
* Repair / replace existing exterior fabric awnings
* Replaster exterior of existing building
* Restripe existing ADA Parking space for van access

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found using this link:  https://schipperconstruction.box.com/s/nc8sbr8tjnuagfsrtxpx3igm3tijst1j

Please see the attached bid form indicating which items are alternates

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, masonry, misc. metals (awnings), rough carpentry, finish carpentry, cabinetry / millwork, insulation, roofing, sheet metal, storefront entry, doors frames & hardware, plaster, drywall, concrete floor seal, tile & stone, painting & staining, toilet partitions / accessories, signage, fire extinguishers, bike racks, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
24
to Aug 21

El Prado - La Quinta Inn & Suites

 

This project consists of converting an existing 3-story, 56 Room Hotel to a remodeled / new 3-Story, 122 Room Hotel with with a pool/spa courtyard area at the ground floor and one sub-grade basement parking level connecting to the existing garage.  The new Hotel will have 124 parking spaces, new lobby, dining, kitchen and exercise rooms.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction. We will have a hard copy set of plans in our plan room

Electronic Plans can be found using this link: https://schipperconstruction.box.com/s/km3ko01r327a4jumla0zcucinz1rw6ls

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com) & Phil Orr (phil@schipperconstruction.com)

The scope of work includes earthwork and site clearing, hard and soft demolition, underground utilities, landscape & irrigation, tower crane, shoring, scaffolding, fencing, site concrete, pavers, wood decking, gravel pathway, tree grates / misc. metals, water features, pool & spa, synthetic turf, bike racks, ceramic pots, a green roof (live roof), tree relocation & removal, SWPPP, surveying, foundation / slab / wall & deck concrete, lightweight concrete, CMU & GFRC / Precast, structural steel, prefabricated stairs, handrails, ornamental iron, glass railing, rough carpentry, finish carpentry, cabinetry / millwork, solid surfaces, sheet metal, waterproofing, insulation, TPA roofing, pedestal pavers, doors frames hardware, storefront / windows, skylights, smoke curtains, lath & plaster, metal stud framing & drywall, ceramic tile, acoustical ceilings, vinyl & carpet flooring, sealed concrete floors, wood flooring, painting, wall covering, toilet partitions & accessories, misc. specialties, food service equipment, laundry equipment, elevator, fire sprinklers, plumbing, HVAC, electrical / low voltage.

View Event →
Jul
23
to Aug 6

5340 Hollister Ave. Tenant Improvements

 

This project consists of the following:

Remodel of existing 2271sf tenant space in (E) 4791sf building.   This project includes the installation of a demising wall to create two separate units, new ADA restrooms, HVAC Equipment, plumbing and electrical fixtures, new finishes in Suite 101 and new ADA Parking Signage.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans for this project can be found here: https://schipperconstruction.box.com/s/9s7gg0fli7lknm5geftjdd9lon4xycvm

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, rough carpentry, finish carpentry, insulation, roof patching, sheet metal, storefront entry, doors frames & hardware, metal stud framing, drywall, sheet vinyl flooring, acoustical ceilings, painting & staining, toilet partitions / accessories, signage, fire extinguishers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
20
to Aug 14

CLUB PILATES, 5 Points Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/5mg4zhpnfb2crg8je4qdu3bsb9fk6lhr

SCOPE OF WORK. Tenant Improvement of 1,890 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, mirrors/glass glazing, acoustic ceilings, painting, toilet accessories, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jun
14
to Jul 11

Santa Barbara High School Boiler Replacement and HVAC Revisions

 

Project name:  Santa Barbara High School Boiler Replacement and HVAC Revisions

Preconstruction Manager: Erwin Villegas

Email: erwin@schipperconstruction.com

Additional Information:

Submit RFI's by Email to Erwin Villegas - DO NOT CALL THE ARCHITECT

Check website regularly for addendums issued during the bid period.

 Estimated Project Budget: $6,000,000

Projected Start Date: August 2018

Bid date and time: 7/11/18 at 3:00PM

This project consists of the following:  Replace Existing steam boiler system at Main building and 20’s/30’s Wings, Gymnasium Building and Field House with Hot Water Boiler System, including associated plumbing and electrical work as follows:

1) Main Building and 20’s / 30’s Wings:

Replace (E) Steam Boiler in Basement Boiler Room with Hot Water Boiler

Restore (E) Radiators in Classrooms and Offices

Replace (E) Fan Unit w/ Individual Fan Coil Units in Framed Soffits in 20’s Wing

Replace (E) Radiators w/ individual Fan Coil Units in Framed Soffits in 30’s Wing

Replace (E) Radiators w/ Heat Pumps in Framed Closets at Computer Rooms 34 and 35

Replace (E) Rooftop Mechanical Units at Auditorium, Old Gym and Classrooms

2) Gymnasium Building

Restore (E) Radiators in Support Spaces

Provide New Rooftop Mechanical Units and Associated Ductwork at Gymnasium

Provide New Mechanical Units at Basement Level

3) Field House

Remove (E) Steam Boiler in Basement Boiler Room and Associated Piping

Remove (E) Radiators in Classrooms and Offices

Remove (E) Suspended Heaters in Locker Rooms

Replace (E) Suspended Acoustical Panel Ceilings & Lighting in Classrooms and Office

Install New Rooftop Mechanical Units for Locker Rooms, Classroom and Offices


Plans, Specifications & Addendum can be found using the following link:https://schipperconstruction.box.com/s/pdwdoh2kc8dzwkq1gt80ktf4aiwdkcjx

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next week; we will notify you on when this jobwalk will occur

Please break out your bid based on the following:

Main Building, 20’s / 30’s Wing                                         $ _________________

Gymnasium Building                                                          $ _________________           

Field House                                                                         $ _________________                                             

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  At least 40 percent for work performed on or after January 1, 2018

This is a DSA Project

This project is PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
 

SCOPE OF WORK:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code. SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17405.7, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
31
to Jun 15

UCSB Trace Metals Clean Rooms

NOTICE TO CONTRACTORS CALLING FOR BIDS

Notice is hereby given that bids will be received by Frank Schipper Construction Co. via email (arlan@schipperconstruction.com) or via fax (805) 963-1270 no later than:

Wednesday, June 13, 2018 at 4:00pm for UCSB Trace Metals Clean Rooms

Plans and Specs may be viewed/downloaded through the link https://schipperconstruction.box.com/s/c53ky739rxqos4wgxji63fqxwzjbm30r  

The project description is as follows:

Construction of a +/- 1,040sf new ISO certified cleanroom laboratory suite for the Department of Earth Science that will be housed on the 2nd floor of an existing building on the University campus.

Projected project budget is $3,000,000.

Projected start date is July 2018

Projected project duration is estimated at 7 months.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17407.5, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
11
to May 31

SB Junior High School Multi-Purpose Room Demo & Site Clearing

 

Preconstruction Manager: Arlan Schipper

Email: arlan@schipperconstruction.com

Estimated Project Budget: $500,000

Projected Start Date: June 25, 2017 (See summary schedule on website for additional information)

Bid date and time: May 31, 2018 @ 2 p.m.

Plans can be found using this link: https://schipperconstruction.box.com/s/zsabuef5zptlaqf32siwgwvom0d2gf3k

Project Description:

This is a Prevailing Wage project consisting of the demolition of 2 existing buildings, including foundations, totaling approximately 20,000sf and associated site clearing of approximately 26,500sf for the eventual construction of a new 15,000sf Multi-purpose room.

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
10
to May 22

2034 Cliff Drive Shell

 

This project consists of the following:

The existing tenant space will be converted into (2) separate tenant spaces.  Remodel to include new roofing, new entrance and storefront on south side of building, new accessible path, (4) new windows, exterior paint & stain, new accessible restrooms, interior walls & finishes.  No new square footage proposed.  Existing parking to remain.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

The link to the plans can be found here: https://schipperconstruction.box.com/s/ki2fuez5mlus9vfku4uph5hwnj3mu0yd

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site concrete, foundation concrete, slab on grade concrete, ornamental iron / misc. metals, rough carpentry, finish carpentry, insulation, roofing, sheet metal, glass & glazing, doors frames & hardware, lath & plaster, metal stud framing, drywall, ceramic tile, painting & staining, toilet partitions / accessories, signage, fire extinguishers, awnings, plumbing, HVAC and Electrical.  

View Event →
Apr
30
to May 8

ParadICE Hawaiian Shave Ice T.I.

 

The scope of work on this project consists of:
Soft demolition and tenant improvements of 450sf from existing salon to specialty food service.

The trades include soft demolition, rough carpentry / wood framing, truss joists, finish carpentry, millwork & cabinetry, insulation, doors frame hardware, fixed louvers, drywall, toilet partitions & accessories, Caesar-stone countertops, HVAC, plumbing & electrical.

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com.  (805) 963-4359 x116

Plans can be found here: https://schipperconstruction.box.com/s/p0na6i033czulq003jy61wjl9euv84yh

 

View Event →
Apr
3
to Apr 20

SB Zoo Giraffe Barn

 

This is a new 1300 square foot Giraffe Barn located at the existing exhibit inside the Santa Barbara Zoo.  The barn consists of caissons and grade beams for the foundation, a concrete slab and structural steel with wood framing for the structure.  The roof will be a Sarnafil TPO Single Ply Membrane Roof and tie interior / exterior walls will have galvanized metal panels and the exterior walls will be plastered.  There are details for a structural steel animal management system included in this set of plans.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/4vgmacuyo2ttlaka33epa7dxuzkxcy9o


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)


The scope of work includes earthwork and site clearing, hard and soft demolition, caissons, foundation concrete, slab on grade concrete, stonework, structural steel, unistrut animal management system, wood framing / rough carpentry, Icynene insulation (walls & ceilings), single ply TPO roof membrane, sheet metal, doors frames hardware, windows glass & glazing, plastering, painting, HVAC, Plumbing, Electrical

View Event →
Feb
28
to Mar 14

Khao Kaeng Tenant Improvements (Empty Bowls)

 

This project consists of a new 1300sf Restaurant Tenant Improvement to Suite 9 located in the lower level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
Plans can be found using this link: https://schipperconstruction.box.com/s/7lcsicy29wi8mf3sg3qk0gnktlnrn6wg

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, concrete patching, ornamental iron, misc. metals, rough carpentry, finish carpentry, cabinetry, solid surface countertops, insulation, FRP installation, roofing, glass & glazing, metal stud framing, drywall, acoustical ceilings, polished concrete flooring, LVT Flooring (alternate), painting, signage, fire extinguishers, lockers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Feb
21
to Mar 7

Coast Village Plaza HVAC

 

This project consists of installing new HVAC Equipment / Distribution to the Suites located in Coast Village Plaza.  
The work is located in both the Lower and Upper Levels of the Plaza.

Plans can be found here: https://schipperconstruction.box.com/s/bei6qkxngj4g1ukwealjg1jmfurn3c5a

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, structural steel, rough carpentry, finish carpentry, roofing, doors frames hardware, metal stud framing, drywall, painting, HVAC and Electrical.  

View Event →
Feb
13
to Feb 22

1290sf TI for LGS

 

This project consists of a 1290sf Tenant Improvement for LGS, (defense contractor) and consists of a 2nd floor tenant improvement for a new conference room and electronic lab.  

Because this work is for a military defense contractor, workers must be a US Citizen and will need to bring proof using a valid US Passport when working on this project.

Plans can be found using this link:https://schipperconstruction.box.com/s/u22phxuws1ketyalb3syhs4463fuig71

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition framing, rough carpentry, finish carpentry, insulation, doors frames hardware, drywall, acoustical ceilings, flooring, painting, HVAC and Electrical.  

View Event →
Feb
6
to Feb 20

Brown & Brown Tenant Improvements (1327sf TI)

 

You can download a set of plans by going onto our SmartBid website or using this link:

        https://schipperconstruction.box.com/s/k2qv3oyr0769x4adcmjgc7u8ifdr7sic

SCOPE OF WORK. Tenant Improvement of 1,327 SF including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, frames & hardware, glazing at sidelights, acoustic ceilings, carpet and vinyl base flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Feb
5
to Feb 16

9676sf T.I. - Thermo Fisher Scientific

 

This project consists of a a Tenant Improvement for Thermo Fisher Scientific on the existing Office Building (9676sf) with new building finishes, and suspended acoustical ceiling system.  There is an alternate to provide a new Men’s and Women’s Restroom.

Plans can be found using this link: https://schipperconstruction.box.com/s/eau74tx0rlc47pff8dk2yxcxsmp1nza9


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition (alternate), concrete patching (alternate), framing, finish carpentry, cabinetry, insulation, doors frames hardware, drywall, ceramic tile, acoustical ceilings, flooring, concrete sealer, painting, window coverings , toilet accessories (alternate) & plumbing.  Electrical work is done by owner.

View Event →
Jan
15
to Jan 19

Investec T.I. at 33 E. Carrillo St, Santa Barbara

 

This project consists of a renovation to existing entries, restrooms, ramp, lobby & elevator cab.   (for a future T.I.)

Plans can be found using this link: https://schipperconstruction.box.com/s/swonqaay5fnjwcyoivqwp11y3c24e4km

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, concrete, truncated domes, ornamental handrails, finish carpentry, cabinetry (restroom lavs), insulation, doors frame hardware, metal stud framing & drywall, ceramic tile, acoustical ceilings, carpeting, painting, toilet partitions & accessories, fire extinguishers, signage, fire sprinklers, HVAC, plumbing & electrical.

View Event →
Jan
9
to Jan 25

GARDENS ON HOPE - 52,000 SF Low Income Senior Center

 

The Housing Authority of Santa Barbara and Garden Court, Inc., are proposing the development of an affordable senior housing project that would be made available to the very low and low income frail, elderly population. The four story project would include 89 studio apartments for rent and a 1 bedroom manager’s unit, a common dining area, commercial kitchen, and common indoor gathering areas. The project also includes a proposed courtyard for common outdoor recreation along South Hope Avenue and Arroyo Burro Creek. 

Proposed BMP’s include permeable pavement in parking and courtyard areas, infiltration trenches along Hope Avenue frontage and walking path at creek, and a bio-retention area at the southwest corner of the site.

You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/e5h21jvn83ka379elosvyh90p2c4omdc

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

BID SCOPE: Surveying, grading & earthwork, SWPPP, curb/gutter/paving/striping, permeable pavers, site and off site concrete, underground utilities, wood fences and gates, wrought iron fence, landscape & irrigation, cast in place concrete & foundation, cementitious underlayment, masonry CMU, structural steel, ornamental iron, rough framing, finish carpentry, millwork & cabinets, waterproofing, membrane roofing, traffic coatings flashing/sheetmetals, fire caulking, doors/frames/hardware, storefront glass, Milgard windows, lath & plaster, metal framing & drywall, ceramic tile, acoustic ceilings, resilient flooring & carpet, painting, toilet partitions & accessories, wall & corner guards, signage, canvas awnings, postal specialties, food services equipment, residential appliances, window treatments, photovoltaic solar panels, elevators, fire protection plumbing, HVAC, electrical, & fire alarm.  

This project is PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Jan
5
to Jan 31

Kellogg Crossing Self-Storage

 

Kellogg Crossing Self-storage

10 S. Kellogg, Goleta, CA 93117

 

Bids Due: Wednesday 1/31/18 @ 3:00 PM

PROJECT INFORMATION: This project consists of the development of an +/- 127,000sf self-storage facility consisting of three, three-story buildings with basements. The net floor area of Building A is 47,392 sf, Building B is 40,984 sf, and Building C is 38,293 sf. Other improvements include 26 new parking spaces, three new fire hydrants, fenced perimeter with automatic gates at entry, upgrades to water, sewer and electrical services. The site will be also be landscaped within the parking areas and around the perimeter of the property.

BID SCOPE: The scope of work includes surveying, landscape & parking , clear & grubbing, earthwork, site / underground utilities, site concrete, curb & gutters, permeable pavers, asphalt paving, striping, signage, SWPPP, landscaping, site bollards, masonry, foundation concrete, slab on grade concrete, fencing, structural steel, misc. metals, rough carpentry, wood & Trex lumber siding, truss joists, single ply roofing, metal roofing & metal siding, sheet metal, roof hatches, insulation, louvers, storefront & windows, doors frames hardware, plaster, drywall, painting, fire sprinklers, plumbing, HVAC & Electrical.

You can download a set of plans by going onto our website or using this link:

https://schipperconstruction.box.com/s/8dnsqb9p6vqmwqyultc650qttafdpy66

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

This project it NOT PREVAILING WAGE

FSCC Preconstruction Manager: Arlan Schipper. arlan@schipperconstruction.com

 

View Event →
Dec
11
to Jan 16

Days Inn Hotel: Demolition and Rebuild

 

 Days Inn Hotel: Demolition and Rebuild

116 Castillo St., SB, Ca. 93101

Bids Due: 1/16/2018 @ 02:00 PM

PROJECT DESCRIPTION: Demolition of existing 8612 sf hotel.  Construction of a new 3-Story, 38 Room, 14,458 sf hotel with 20 covered parking spaces and 18 uncovered parking spaces.  30 Rooms are located above parking in the 3-Story portion of the structure along the northern property line.  The remaining (8) Rooms are on the first and second floor towards the east portion of the site.  An interior setback modification is requested for the 1st and 2nd stories of the building along the southeast property lines.

You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/ek1undkla4ve9vw4a24x0m7oahlu199s.

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

BID SCOPE: soft demolition, hard demolition, site grading, site clearing, haz mat remediation, asphalt, site concrete, truncated domes, parking lot striping & signage, underground utilities, landscaping, foundation concrete, slab concrete, structural steel, decorative metal railings, rough carpentry / wood framing, truss joists, finish carpentry, millwork & cabinetry, sheet waterproofing, rubberized asphalt weatherproofing, insulation, roofing, sheet metal, weather barriers, vapor barriers, firestopping, joint sealants, doors frame hardware, access doors, overhead coiling doorors, aluminum windows, metal clad wood windows, fixed louvers, plaster, drywall, tiling, carpeting, painting, flooring, toilet partitions & accessories, stone countertops, hydraulic passenger elevators, fire sprinklers, HVAC, plumbing, electrical & fire alarm.

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Dec
7
to Jan 17

Saint Marks UCSB Parish Addition

 

This project consists of an exterior remodel of 11,455sf church facade, interior remodel of kitchen & bathroom facilities; addition of 462sf multipurpose room; addition of 108sf storage area; HVAC improvements & exterior sitework & landscaping

Plans can be obtained using the following link: https://schipperconstruction.box.com/s/xlaqvuzzq87zt7mi4d58ns2a7yi2rhtr


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, parking lot striping & signage, landscaping, foundation concrete, slab concrete, structural steel, rough carpentry / wood framing, truss joists, finish carpentry, cabinetry, insulation, roofing, sheet metal, waterproofing, doors frame hardware, windows, plaster, drywall, painting, flooring, toilet partitions & accessories, fire sprinklers, HVAC, plumbing & electrical.

View Event →
Dec
6
to Jan 8

22,028 – 47,173 SF New Commercial/Retail Construction

 


    Project Description: Industrial/retail center w/ coffee shop for SBA.      
        
    Bid Notes: 
    Site Improvements include new landscaping, new trash enclosure, site lighting, new parking lot w curb & gutter, concrete sidewalks,  ADA path of travel work, storm-water drainage, bio infiltrations and retention basin, gravel infiltration trench, fencing, EV charging, and permeable pavers. 

Project bids as base scope plus three significant alternates. See attached bid instructions. Please submit your bid as: base bid, bid alternate #1, bid alternate #2, bid alternate #3.
    
    
    You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/342ahs1xlf09vx7xwvjk2of9say3ulxd
    
    If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.
    
    BID SCOPE: The scope of work includes surveying, landscape & parking , clear & grubbing, earthwork, site / underground utilities, site concrete, curb & gutters, permeable pavers, asphalt paving, striping, signage, SWPPP, landscaping, site accessories, masonry, foundation concrete, slab on grade concrete, fencing, structural steel, misc. metals, rough carpentry, wood & Trex lumber siding, truss joists, single ply roofing, metal siding, sheet metal, roof hatches, insulation, louvers, storefront & windows, doors frames hardware, plaster, drywall, painting, fire sprinklers, plumbing, HVAC, Solar & Electrical. See attached bid scope for breakdown by base bid and alternates. 
    
    This project is PREVAILING WAGE. DIR registration number is required with your bid. 
    MBW / WBE / DVBE Contractors are encouraged to bid
    
FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Nov
28
to Dec 8

Wash n Fun / Superior Fitness

 

This project consists of the following:

* Abate Violations for non-permitted structures (Demo Structures that are non-compliant)
* New Open Air Laundry Mechanical Area at Rear of Building
* Restripe Parking Lot and provide ADA Parking & Path of Travel
* Provide new Site Landscaping
* Demo interior non-bearing walls
* Install new wood site fencing
* Install new non-bearing partition walls
* Install new ADA Compliant Bathroom

Plans can be found using the following link: https://schipperconstruction.box.com/s/n8v33maokkebjxljp3ocs7ekfrm5x996


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, permeable pavers, parking lot striping & signage, underground utilities, SWPPP, fencing, SOG concrete, landscaping, metal handrails, rough carpentry, finish carpentry, insulation, firestopping, sheet metal, metal roofing, gutters & downspouts, doors frames hardware, drywall, plaster, painting, toilet accessories, signage, bike rack, plumbing and electrical.

View Event →
Oct
26
to Nov 16

4 Story Mixed Use - 116 E. Cota St., Santa Barbara, Ca. 93101

 

You can download a set of plans by going onto our SmartBid website or using this link:

                                   https://schipperconstruction.box.com/s/5coy8v5houdkt8azyqas19rz234362yx

The proposed project consists of a new four-story mixed-use residential and commercial building of approximately 34,500 total SF, with approximately 988 SF of commercial space; 15 apartment units and 16 on grade parking spaces.

This project is NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Oct
26
to Nov 10

Entrada Rooftop Pool Bar

 

Project Estimator: Erwin Villegas
Proposals and RFI’s may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project consists of installing a new fully enclosed Rooftop Pool Bar with a new 274sf service area at the 4th floor pool deck.

Plans, Specifications, and Addenda can be accessed as follows: 

1. Download the files using the link https://schipperconstruction.box.com/s/mgy0rf6m1cperpcfcqmway09treclwtg

2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday.

3. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes hard and soft demolition, scaffolding, structural steel, rough and finish carpentry, roofing, sheet metal, insulation, waterproofing, windows, doors frames hardware, quarry tile, metal stud framing & drywall, painting, plastering, fire extinguishers, signage, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical, fire alarm.

View Event →