Santa Barbara Humane Campus Renovation Project
Frank Schipper Construction Co. is inviting you to bid on the Santa Barbara Humane Campus Renovation Project located at 5399 Overpass Road, Goleta, CA. Below are our team members including their contact information that will be working on this project.
Phase 1 Building Construction:
Ron Morales at rmorales@schipperconstruction.com; 805-963-4359
Phase 2 Building Construction:
Phil Orr at phil@schipperconstruction.com; 805-963-4359
On & Off Site Construction:
Rodrigo Gimenez at rgimenez@schipperconstruction.com; 805-963-4359
Bids are due no later than EOD May 30, 2025
Request for Information RFI’s are due EOD May 14, 2025
The proposed Project involves a comprehensive renovation of a 3.99-acre campus across two phases, including the following:
Phase 1: Campus Renovation (1.10 acres)
• New Structures:
· 2 buildings: Intake (8,718 sq ft) and Behavior Center (1,595 sq ft).
· Trash enclosure (448 sq ft).
• Site Work:
· 2 accessible parking spaces, fire truck access lane, temporary power setup.
· 17 new parking spaces, landscaping, and dog yards.
Demolition:
· 2 structures (3,232 sq ft) and partial parking area (22 spaces removed).
· Utilities and site paving will be addressed.
·
Phase 2: Campus Renovation (2.89 acres)
· New and Renovated Structures:
· 4 new buildings (total 23,598 sq ft) and renovation of the Education/Admin building (8,883 sq ft).
· Historic Beck House rehabilitation (1,629 sq ft).
· Other Site Structures – Covered Patios, Dog Yard Shade Structures (3,166 sq ft).
Site Work:
· 4 new accessible parking spaces and 47 additional paved spaces.
· Electric Yard and solar microgrid construction for power.
•
Demolition:
· 9 structures (19,946 sq ft) and existing parking areas removed.
NOTE: There are no Prevailing Wage requirements for this project.
The Owner has requested that all bids be broken down as follows:
Construction Cost Detail:
Phase 1:
· Intake Building F $____________
· Dog Behavior Building G $____________
· Site Development / Onsite & Offsite $____________
Phase 2:
· Dog Adoption Building A $____________
· Cat Rabbit Adoption Building B $____________
· Medical Center Building C $____________
· Education Center / Administration Building DE $____________
· Beck House Building H $____________
· Service Building I $____________
You can access the Bid Documents with the following link: