Jul
24
to Aug 28

El Prado - La Quinta Inn & Suites

 

This project consists of converting an existing 3-story, 56 Room Hotel to a remodeled / new 3-Story, 122 Room Hotel with with a pool/spa courtyard area at the ground floor and one sub-grade basement parking level connecting to the existing garage.  The new Hotel will have 124 parking spaces, new lobby, dining, kitchen and exercise rooms.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction. We will have a hard copy set of plans in our plan room

Electronic Plans can be found using this link: https://schipperconstruction.box.com/s/km3ko01r327a4jumla0zcucinz1rw6ls

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com) & Phil Orr (phil@schipperconstruction.com)

The scope of work includes earthwork and site clearing, hard and soft demolition, underground utilities, landscape & irrigation, tower crane, shoring, scaffolding, fencing, site concrete, pavers, wood decking, gravel pathway, tree grates / misc. metals, water features, pool & spa, synthetic turf, bike racks, ceramic pots, a green roof (live roof), tree relocation & removal, SWPPP, surveying, foundation / slab / wall & deck concrete, lightweight concrete, CMU & GFRC / Precast, structural steel, prefabricated stairs, handrails, ornamental iron, glass railing, rough carpentry, finish carpentry, cabinetry / millwork, solid surfaces, sheet metal, waterproofing, insulation, TPA roofing, pedestal pavers, doors frames hardware, storefront / windows, skylights, smoke curtains, lath & plaster, metal stud framing & drywall, ceramic tile, acoustical ceilings, vinyl & carpet flooring, sealed concrete floors, wood flooring, painting, wall covering, toilet partitions & accessories, misc. specialties, food service equipment, laundry equipment, elevator, fire sprinklers, plumbing, HVAC, electrical / low voltage.

View Event →

Jul
23
to Aug 6

5340 Hollister Ave. Tenant Improvements

 

This project consists of the following:

Remodel of existing 2271sf tenant space in (E) 4791sf building.   This project includes the installation of a demising wall to create two separate units, new ADA restrooms, HVAC Equipment, plumbing and electrical fixtures, new finishes in Suite 101 and new ADA Parking Signage.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans for this project can be found here: https://schipperconstruction.box.com/s/9s7gg0fli7lknm5geftjdd9lon4xycvm

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, rough carpentry, finish carpentry, insulation, roof patching, sheet metal, storefront entry, doors frames & hardware, metal stud framing, drywall, sheet vinyl flooring, acoustical ceilings, painting & staining, toilet partitions / accessories, signage, fire extinguishers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
20
to Aug 14

CLUB PILATES, 5 Points Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/5mg4zhpnfb2crg8je4qdu3bsb9fk6lhr

SCOPE OF WORK. Tenant Improvement of 1,890 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, mirrors/glass glazing, acoustic ceilings, painting, toilet accessories, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jun
14
to Jul 11

Santa Barbara High School Boiler Replacement and HVAC Revisions

 

Project name:  Santa Barbara High School Boiler Replacement and HVAC Revisions

Preconstruction Manager: Erwin Villegas

Email: erwin@schipperconstruction.com

Additional Information:

Submit RFI's by Email to Erwin Villegas - DO NOT CALL THE ARCHITECT

Check website regularly for addendums issued during the bid period.

 Estimated Project Budget: $6,000,000

Projected Start Date: August 2018

Bid date and time: 7/11/18 at 3:00PM

This project consists of the following:  Replace Existing steam boiler system at Main building and 20’s/30’s Wings, Gymnasium Building and Field House with Hot Water Boiler System, including associated plumbing and electrical work as follows:

1) Main Building and 20’s / 30’s Wings:

Replace (E) Steam Boiler in Basement Boiler Room with Hot Water Boiler

Restore (E) Radiators in Classrooms and Offices

Replace (E) Fan Unit w/ Individual Fan Coil Units in Framed Soffits in 20’s Wing

Replace (E) Radiators w/ individual Fan Coil Units in Framed Soffits in 30’s Wing

Replace (E) Radiators w/ Heat Pumps in Framed Closets at Computer Rooms 34 and 35

Replace (E) Rooftop Mechanical Units at Auditorium, Old Gym and Classrooms

2) Gymnasium Building

Restore (E) Radiators in Support Spaces

Provide New Rooftop Mechanical Units and Associated Ductwork at Gymnasium

Provide New Mechanical Units at Basement Level

3) Field House

Remove (E) Steam Boiler in Basement Boiler Room and Associated Piping

Remove (E) Radiators in Classrooms and Offices

Remove (E) Suspended Heaters in Locker Rooms

Replace (E) Suspended Acoustical Panel Ceilings & Lighting in Classrooms and Office

Install New Rooftop Mechanical Units for Locker Rooms, Classroom and Offices


Plans, Specifications & Addendum can be found using the following link:https://schipperconstruction.box.com/s/pdwdoh2kc8dzwkq1gt80ktf4aiwdkcjx

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next week; we will notify you on when this jobwalk will occur

Please break out your bid based on the following:

Main Building, 20’s / 30’s Wing                                         $ _________________

Gymnasium Building                                                          $ _________________           

Field House                                                                         $ _________________                                             

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  At least 40 percent for work performed on or after January 1, 2018

This is a DSA Project

This project is PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
 

SCOPE OF WORK:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code. SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17405.7, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
31
to Jun 15

UCSB Trace Metals Clean Rooms

NOTICE TO CONTRACTORS CALLING FOR BIDS

Notice is hereby given that bids will be received by Frank Schipper Construction Co. via email (arlan@schipperconstruction.com) or via fax (805) 963-1270 no later than:

Wednesday, June 13, 2018 at 4:00pm for UCSB Trace Metals Clean Rooms

Plans and Specs may be viewed/downloaded through the link https://schipperconstruction.box.com/s/c53ky739rxqos4wgxji63fqxwzjbm30r  

The project description is as follows:

Construction of a +/- 1,040sf new ISO certified cleanroom laboratory suite for the Department of Earth Science that will be housed on the 2nd floor of an existing building on the University campus.

Projected project budget is $3,000,000.

Projected start date is July 2018

Projected project duration is estimated at 7 months.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17407.5, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
11
to May 31

SB Junior High School Multi-Purpose Room Demo & Site Clearing

 

Preconstruction Manager: Arlan Schipper

Email: arlan@schipperconstruction.com

Estimated Project Budget: $500,000

Projected Start Date: June 25, 2017 (See summary schedule on website for additional information)

Bid date and time: May 31, 2018 @ 2 p.m.

Plans can be found using this link: https://schipperconstruction.box.com/s/zsabuef5zptlaqf32siwgwvom0d2gf3k

Project Description:

This is a Prevailing Wage project consisting of the demolition of 2 existing buildings, including foundations, totaling approximately 20,000sf and associated site clearing of approximately 26,500sf for the eventual construction of a new 15,000sf Multi-purpose room.

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
10
to May 22

2034 Cliff Drive Shell

 

This project consists of the following:

The existing tenant space will be converted into (2) separate tenant spaces.  Remodel to include new roofing, new entrance and storefront on south side of building, new accessible path, (4) new windows, exterior paint & stain, new accessible restrooms, interior walls & finishes.  No new square footage proposed.  Existing parking to remain.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

The link to the plans can be found here: https://schipperconstruction.box.com/s/ki2fuez5mlus9vfku4uph5hwnj3mu0yd

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site concrete, foundation concrete, slab on grade concrete, ornamental iron / misc. metals, rough carpentry, finish carpentry, insulation, roofing, sheet metal, glass & glazing, doors frames & hardware, lath & plaster, metal stud framing, drywall, ceramic tile, painting & staining, toilet partitions / accessories, signage, fire extinguishers, awnings, plumbing, HVAC and Electrical.  

View Event →
Apr
30
to May 8

ParadICE Hawaiian Shave Ice T.I.

 

The scope of work on this project consists of:
Soft demolition and tenant improvements of 450sf from existing salon to specialty food service.

The trades include soft demolition, rough carpentry / wood framing, truss joists, finish carpentry, millwork & cabinetry, insulation, doors frame hardware, fixed louvers, drywall, toilet partitions & accessories, Caesar-stone countertops, HVAC, plumbing & electrical.

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com.  (805) 963-4359 x116

Plans can be found here: https://schipperconstruction.box.com/s/p0na6i033czulq003jy61wjl9euv84yh

 

View Event →
Apr
3
to Apr 20

SB Zoo Giraffe Barn

 

This is a new 1300 square foot Giraffe Barn located at the existing exhibit inside the Santa Barbara Zoo.  The barn consists of caissons and grade beams for the foundation, a concrete slab and structural steel with wood framing for the structure.  The roof will be a Sarnafil TPO Single Ply Membrane Roof and tie interior / exterior walls will have galvanized metal panels and the exterior walls will be plastered.  There are details for a structural steel animal management system included in this set of plans.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/4vgmacuyo2ttlaka33epa7dxuzkxcy9o


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)


The scope of work includes earthwork and site clearing, hard and soft demolition, caissons, foundation concrete, slab on grade concrete, stonework, structural steel, unistrut animal management system, wood framing / rough carpentry, Icynene insulation (walls & ceilings), single ply TPO roof membrane, sheet metal, doors frames hardware, windows glass & glazing, plastering, painting, HVAC, Plumbing, Electrical

View Event →
Feb
28
to Mar 14

Khao Kaeng Tenant Improvements (Empty Bowls)

 

This project consists of a new 1300sf Restaurant Tenant Improvement to Suite 9 located in the lower level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
Plans can be found using this link: https://schipperconstruction.box.com/s/7lcsicy29wi8mf3sg3qk0gnktlnrn6wg

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, concrete patching, ornamental iron, misc. metals, rough carpentry, finish carpentry, cabinetry, solid surface countertops, insulation, FRP installation, roofing, glass & glazing, metal stud framing, drywall, acoustical ceilings, polished concrete flooring, LVT Flooring (alternate), painting, signage, fire extinguishers, lockers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Feb
21
to Mar 7

Coast Village Plaza HVAC

 

This project consists of installing new HVAC Equipment / Distribution to the Suites located in Coast Village Plaza.  
The work is located in both the Lower and Upper Levels of the Plaza.

Plans can be found here: https://schipperconstruction.box.com/s/bei6qkxngj4g1ukwealjg1jmfurn3c5a

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, structural steel, rough carpentry, finish carpentry, roofing, doors frames hardware, metal stud framing, drywall, painting, HVAC and Electrical.  

View Event →
Feb
13
to Feb 22

1290sf TI for LGS

 

This project consists of a 1290sf Tenant Improvement for LGS, (defense contractor) and consists of a 2nd floor tenant improvement for a new conference room and electronic lab.  

Because this work is for a military defense contractor, workers must be a US Citizen and will need to bring proof using a valid US Passport when working on this project.

Plans can be found using this link:https://schipperconstruction.box.com/s/u22phxuws1ketyalb3syhs4463fuig71

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition framing, rough carpentry, finish carpentry, insulation, doors frames hardware, drywall, acoustical ceilings, flooring, painting, HVAC and Electrical.  

View Event →
Feb
6
to Feb 20

Brown & Brown Tenant Improvements (1327sf TI)

 

You can download a set of plans by going onto our SmartBid website or using this link:

        https://schipperconstruction.box.com/s/k2qv3oyr0769x4adcmjgc7u8ifdr7sic

SCOPE OF WORK. Tenant Improvement of 1,327 SF including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, frames & hardware, glazing at sidelights, acoustic ceilings, carpet and vinyl base flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Feb
5
to Feb 16

9676sf T.I. - Thermo Fisher Scientific

 

This project consists of a a Tenant Improvement for Thermo Fisher Scientific on the existing Office Building (9676sf) with new building finishes, and suspended acoustical ceiling system.  There is an alternate to provide a new Men’s and Women’s Restroom.

Plans can be found using this link: https://schipperconstruction.box.com/s/eau74tx0rlc47pff8dk2yxcxsmp1nza9


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition (alternate), concrete patching (alternate), framing, finish carpentry, cabinetry, insulation, doors frames hardware, drywall, ceramic tile, acoustical ceilings, flooring, concrete sealer, painting, window coverings , toilet accessories (alternate) & plumbing.  Electrical work is done by owner.

View Event →
Jan
15
to Jan 19

Investec T.I. at 33 E. Carrillo St, Santa Barbara

 

This project consists of a renovation to existing entries, restrooms, ramp, lobby & elevator cab.   (for a future T.I.)

Plans can be found using this link: https://schipperconstruction.box.com/s/swonqaay5fnjwcyoivqwp11y3c24e4km

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, concrete, truncated domes, ornamental handrails, finish carpentry, cabinetry (restroom lavs), insulation, doors frame hardware, metal stud framing & drywall, ceramic tile, acoustical ceilings, carpeting, painting, toilet partitions & accessories, fire extinguishers, signage, fire sprinklers, HVAC, plumbing & electrical.

View Event →
Jan
9
to Jan 25

GARDENS ON HOPE - 52,000 SF Low Income Senior Center

 

The Housing Authority of Santa Barbara and Garden Court, Inc., are proposing the development of an affordable senior housing project that would be made available to the very low and low income frail, elderly population. The four story project would include 89 studio apartments for rent and a 1 bedroom manager’s unit, a common dining area, commercial kitchen, and common indoor gathering areas. The project also includes a proposed courtyard for common outdoor recreation along South Hope Avenue and Arroyo Burro Creek. 

Proposed BMP’s include permeable pavement in parking and courtyard areas, infiltration trenches along Hope Avenue frontage and walking path at creek, and a bio-retention area at the southwest corner of the site.

You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/e5h21jvn83ka379elosvyh90p2c4omdc

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

BID SCOPE: Surveying, grading & earthwork, SWPPP, curb/gutter/paving/striping, permeable pavers, site and off site concrete, underground utilities, wood fences and gates, wrought iron fence, landscape & irrigation, cast in place concrete & foundation, cementitious underlayment, masonry CMU, structural steel, ornamental iron, rough framing, finish carpentry, millwork & cabinets, waterproofing, membrane roofing, traffic coatings flashing/sheetmetals, fire caulking, doors/frames/hardware, storefront glass, Milgard windows, lath & plaster, metal framing & drywall, ceramic tile, acoustic ceilings, resilient flooring & carpet, painting, toilet partitions & accessories, wall & corner guards, signage, canvas awnings, postal specialties, food services equipment, residential appliances, window treatments, photovoltaic solar panels, elevators, fire protection plumbing, HVAC, electrical, & fire alarm.  

This project is PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Jan
5
to Jan 31

Kellogg Crossing Self-Storage

 

Kellogg Crossing Self-storage

10 S. Kellogg, Goleta, CA 93117

 

Bids Due: Wednesday 1/31/18 @ 3:00 PM

PROJECT INFORMATION: This project consists of the development of an +/- 127,000sf self-storage facility consisting of three, three-story buildings with basements. The net floor area of Building A is 47,392 sf, Building B is 40,984 sf, and Building C is 38,293 sf. Other improvements include 26 new parking spaces, three new fire hydrants, fenced perimeter with automatic gates at entry, upgrades to water, sewer and electrical services. The site will be also be landscaped within the parking areas and around the perimeter of the property.

BID SCOPE: The scope of work includes surveying, landscape & parking , clear & grubbing, earthwork, site / underground utilities, site concrete, curb & gutters, permeable pavers, asphalt paving, striping, signage, SWPPP, landscaping, site bollards, masonry, foundation concrete, slab on grade concrete, fencing, structural steel, misc. metals, rough carpentry, wood & Trex lumber siding, truss joists, single ply roofing, metal roofing & metal siding, sheet metal, roof hatches, insulation, louvers, storefront & windows, doors frames hardware, plaster, drywall, painting, fire sprinklers, plumbing, HVAC & Electrical.

You can download a set of plans by going onto our website or using this link:

https://schipperconstruction.box.com/s/8dnsqb9p6vqmwqyultc650qttafdpy66

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

This project it NOT PREVAILING WAGE

FSCC Preconstruction Manager: Arlan Schipper. arlan@schipperconstruction.com

 

View Event →
Dec
11
to Jan 16

Days Inn Hotel: Demolition and Rebuild

 

 Days Inn Hotel: Demolition and Rebuild

116 Castillo St., SB, Ca. 93101

Bids Due: 1/16/2018 @ 02:00 PM

PROJECT DESCRIPTION: Demolition of existing 8612 sf hotel.  Construction of a new 3-Story, 38 Room, 14,458 sf hotel with 20 covered parking spaces and 18 uncovered parking spaces.  30 Rooms are located above parking in the 3-Story portion of the structure along the northern property line.  The remaining (8) Rooms are on the first and second floor towards the east portion of the site.  An interior setback modification is requested for the 1st and 2nd stories of the building along the southeast property lines.

You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/ek1undkla4ve9vw4a24x0m7oahlu199s.

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.

BID SCOPE: soft demolition, hard demolition, site grading, site clearing, haz mat remediation, asphalt, site concrete, truncated domes, parking lot striping & signage, underground utilities, landscaping, foundation concrete, slab concrete, structural steel, decorative metal railings, rough carpentry / wood framing, truss joists, finish carpentry, millwork & cabinetry, sheet waterproofing, rubberized asphalt weatherproofing, insulation, roofing, sheet metal, weather barriers, vapor barriers, firestopping, joint sealants, doors frame hardware, access doors, overhead coiling doorors, aluminum windows, metal clad wood windows, fixed louvers, plaster, drywall, tiling, carpeting, painting, flooring, toilet partitions & accessories, stone countertops, hydraulic passenger elevators, fire sprinklers, HVAC, plumbing, electrical & fire alarm.

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Dec
7
to Jan 17

Saint Marks UCSB Parish Addition

 

This project consists of an exterior remodel of 11,455sf church facade, interior remodel of kitchen & bathroom facilities; addition of 462sf multipurpose room; addition of 108sf storage area; HVAC improvements & exterior sitework & landscaping

Plans can be obtained using the following link: https://schipperconstruction.box.com/s/xlaqvuzzq87zt7mi4d58ns2a7yi2rhtr


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, parking lot striping & signage, landscaping, foundation concrete, slab concrete, structural steel, rough carpentry / wood framing, truss joists, finish carpentry, cabinetry, insulation, roofing, sheet metal, waterproofing, doors frame hardware, windows, plaster, drywall, painting, flooring, toilet partitions & accessories, fire sprinklers, HVAC, plumbing & electrical.

View Event →
Dec
6
to Jan 8

22,028 – 47,173 SF New Commercial/Retail Construction

 


    Project Description: Industrial/retail center w/ coffee shop for SBA.      
        
    Bid Notes: 
    Site Improvements include new landscaping, new trash enclosure, site lighting, new parking lot w curb & gutter, concrete sidewalks,  ADA path of travel work, storm-water drainage, bio infiltrations and retention basin, gravel infiltration trench, fencing, EV charging, and permeable pavers. 

Project bids as base scope plus three significant alternates. See attached bid instructions. Please submit your bid as: base bid, bid alternate #1, bid alternate #2, bid alternate #3.
    
    
    You can download a set of plans by going onto our website or using this link: https://schipperconstruction.box.com/s/342ahs1xlf09vx7xwvjk2of9say3ulxd
    
    If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room.
    
    BID SCOPE: The scope of work includes surveying, landscape & parking , clear & grubbing, earthwork, site / underground utilities, site concrete, curb & gutters, permeable pavers, asphalt paving, striping, signage, SWPPP, landscaping, site accessories, masonry, foundation concrete, slab on grade concrete, fencing, structural steel, misc. metals, rough carpentry, wood & Trex lumber siding, truss joists, single ply roofing, metal siding, sheet metal, roof hatches, insulation, louvers, storefront & windows, doors frames hardware, plaster, drywall, painting, fire sprinklers, plumbing, HVAC, Solar & Electrical. See attached bid scope for breakdown by base bid and alternates. 
    
    This project is PREVAILING WAGE. DIR registration number is required with your bid. 
    MBW / WBE / DVBE Contractors are encouraged to bid
    
FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com

View Event →
Nov
28
to Dec 8

Wash n Fun / Superior Fitness

 

This project consists of the following:

* Abate Violations for non-permitted structures (Demo Structures that are non-compliant)
* New Open Air Laundry Mechanical Area at Rear of Building
* Restripe Parking Lot and provide ADA Parking & Path of Travel
* Provide new Site Landscaping
* Demo interior non-bearing walls
* Install new wood site fencing
* Install new non-bearing partition walls
* Install new ADA Compliant Bathroom

Plans can be found using the following link: https://schipperconstruction.box.com/s/n8v33maokkebjxljp3ocs7ekfrm5x996


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, permeable pavers, parking lot striping & signage, underground utilities, SWPPP, fencing, SOG concrete, landscaping, metal handrails, rough carpentry, finish carpentry, insulation, firestopping, sheet metal, metal roofing, gutters & downspouts, doors frames hardware, drywall, plaster, painting, toilet accessories, signage, bike rack, plumbing and electrical.

View Event →
Oct
26
to Nov 16

4 Story Mixed Use - 116 E. Cota St., Santa Barbara, Ca. 93101

 

You can download a set of plans by going onto our SmartBid website or using this link:

                                   https://schipperconstruction.box.com/s/5coy8v5houdkt8azyqas19rz234362yx

The proposed project consists of a new four-story mixed-use residential and commercial building of approximately 34,500 total SF, with approximately 988 SF of commercial space; 15 apartment units and 16 on grade parking spaces.

This project is NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Oct
26
to Nov 10

Entrada Rooftop Pool Bar

 

Project Estimator: Erwin Villegas
Proposals and RFI’s may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project consists of installing a new fully enclosed Rooftop Pool Bar with a new 274sf service area at the 4th floor pool deck.

Plans, Specifications, and Addenda can be accessed as follows: 

1. Download the files using the link https://schipperconstruction.box.com/s/mgy0rf6m1cperpcfcqmway09treclwtg

2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday.

3. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes hard and soft demolition, scaffolding, structural steel, rough and finish carpentry, roofing, sheet metal, insulation, waterproofing, windows, doors frames hardware, quarry tile, metal stud framing & drywall, painting, plastering, fire extinguishers, signage, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical, fire alarm.

View Event →
Oct
25
to Oct 30

Tri Counties Regional Center Bldg B

 

This project consists of a 4181sf Tenant Improvement for the existing tenant space including new interior doors, non bearing interior walls, new ceiling system, new carpet tile flooring with rubber base, new electrical & reworking of Mechanical System.

Plans can be found here:  https://schipperconstruction.box.com/s/rhg3ofymii4fnzecbzch1ezioh7sr9t8

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site grading, asphalt, site concrete, truncated domes, parking lot striping & signage, insulation, metal stud framing & drywall, painting, carpet tile flooring, acoustical ceilings, painting, cabinetry, doors frames hardware, vision-lites / side-lites, ceramic tile, toilet partitions & accessories, fire sprinkler relocation, HVAC, plumbing & electrical.

View Event →
Oct
23
to Nov 2

Brain Balance Center, Goleta

 

You can download a set of plans by going onto our SmartBid website or using this link:

                                      https://schipperconstruction.box.com/s/wouz49842k6kccs9jqe06dnge56nmg1m

SCOPE OF WORK. Tenant Improvement of 2,698 SF including: interior finishes, prefinished architectural millwork and p-lam countertops, light gage metal framing, insulation, drywall, interior doors, frames & hardware, acoustic ceilings, carpet and vinyl flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Oct
3
to Oct 18

Vandenberg Village Community Services District

 

You can download a set of plans by going onto our SmartBid website or using this link:

https://schipperconstruction.box.com/s/0j8x39trb883zrqdpi4jemla9nl1b973

BID SCOPE. This project involves the renovation of the former Rabobank building including but not limited to: demolition, mechanical, electrical, plumbing, HVAC, security/fire systems, roofing, drywall and metal stud framing, tile, cabinetry, solid surface & P-lam countertops, ceramic tile, glass/glazing, doors & hardware, windows, paint, acoustic tile, flooring, bath accessories,  signs/signage, and workstation modifications. Exterior work includes landscaping & irrigation, landscape lighting, permeable pavers, new gated CMU trash enclosure, curbs and paving, & security bollards.

This project is PREVAILING WAGE and requires DIR registration

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

View Event →
Sep
18
to Sep 26

Champagne Nail Bar

 

Project Estimator: Erwin Villegas
Proposals and RFI’s may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project consists of interior Tenant Improvements to existing commercial lease space near Five Points Plaza.  This remodel of roughly 1400sf will turn an existing empty unit into a Pedicure Nail Salon complete with pedicure stations and facial rooms.

Plans, Specifications, and Addenda can be accessed as follows: 

1. Download the files using the link on this website: https://schipperconstruction.box.com/s/clhptvyia9kt2w8un1jlaqdch3csh3ej

2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday.

3. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes hard and soft demolition, metal stud framing & drywall, doors frames & hardware, tempered glass panels, rough & finish carpentry, cabinetry, acoustical ceilings, ceramic tile, painting, toilet accessories, fire sprinklers, mechanical, plumbing, HVAC and electrical.

View Event →
Sep
8
2:00 PM14:00

The Maris Collective (T.I. at Entrada de Santa Barbara)

 

Project Estimator: Erwin Villegas
Proposals and RFI’s may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project consists of interior Tenant Improvements to existing commercial lease space within AREA B of the Entrada de Santa Barbara.  The scope of work includes new non load bearing partition walls, new fitting rooms, mechanical, electrical & fire sprinklers with associated interior TI & Lighting.

Plans, Specifications, and Addenda can be accessed as follows: 

1. Download the files using the link https://schipperconstruction.box.com/s/eibll7k6uct59risjm8kxh3ykmfh9mug


2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday.

3. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

This project HAS A PLA Agreement in place.  Please refer to the Public Labor Agreement Exhibit noted in the contract documents.

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes metal stud framing & drywall, doors frames & hardware, wood flooring, tile, wood ceiling, finish carpentry, painting, wallcovering, fire sprinklers, mechanical, plumbing, HVAC and electrical.

View Event →
Sep
7
to Sep 28

Cabrillo Pavilion Arts Center & Bathhouse Renovation Project

 

You can download a set of plans by going onto our SmartBid website or using this link: https://schipperconstruction.box.com/s/vn7qwawz95oxwzhlrm5segzuf377mchw

BID SCOPE: The Scope of Work includes:

The proposed project would rehabilitate the Cabrillo Pavilion, a City Designated Structure of Merit (qualified historic building) and the surrounding site to enhance public access and community use, address failing systems, and meet current ADA code requirements by making the following improvements. On & off site improvements, concrete, paving, pavers, below grade waterproofing & grading, parking lot repaving & striping. Signage. Complete renovations of first floor (beach level), demolition & HazMat, new lockers & shower rooms, elevator, doors & windows, restrooms. Light gage metal framing, drywall, lath & plaster, fiberwrap, painting, decorative & stainless steel ironwork, & bollards.  Remodel of second floor (street level): remodel of lobby, restrooms, warming kitchen, reconstruction and expansion of existing support spaces, flooring, ceramic tile, acoustic panels, millwork, doors/windows/hardware.  Building structural repairs and seismic upgrades: concrete repair and retrofit at portico and STOA, insulation, single ply and tile roofing. Bird deterrents& specialties. GFRC grills.  Complete MEP communications and AV system upgrades. New building wide automatic fire sprinkler system (requires separate permit.) Fumigate Pavilion bathhouse and STOA for termites. SWPPP. LEED Silver certification.

This project is  PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

View Event →
May
2
2:00 PM14:00

Interim Housing Multiple Campuses (Carpinteria USD)

  • 1480 Linden Avenue Carpinteria, CA 93013 (map)
  • Google Calendar ICS

Tuesday, May 02, 2017 at 02:00 PM — 02:00 PM

Project Estimator: Erwin Villegas
Proposals and RFI's may be emailed directly to erwin@schipperconstruction.com

Job walk; None, contact estimator if site visit is desired

Project Description: This project is to remove and relocate portable buildings including site preparation, site grading, demolition, site utilities, asphalt paving, new ADA restroom modifications, Plumbing, Electrical and Fire Alarm.

Plans, Specifications, and Addenda can be accessed as follows:

1. Access and download from the Frank Schipper Construction Co. website: https://schipperconstruction.box.com/s/jvqqeun32206oontucj02fze2sujguju

2. View plans at Frank Schipper Construction Co. : Plans and Specifications are available for review at the Frank Schipper Construction Co. office; 610 E. Cota St,, Santa Barbara, Ca. 8 AM to 5 PM, Monday – Friday. 


3. CD:. A copy of the plans and specifications can be burned on a CD and be mailed or picked up at our office. Please call the front desk at 963-4359 or email info@schipperconstruction.com to request a CD.

This project IS PREVAILING WAGE

DIR Certification is required

MBW / WBE / DVBE Contractors are encouraged to bid

The scope of work includes site prepration, site grading, hard and soft demolition, site utilities, asphalt paving & striping, truncated domes, chain link fence & gates, hazardous materials removal, modular stairs, ramps, & landings, steel pipe & tube railings, finish carpentry, lath & plaster, metal stud framing & drywall, ceramic tile, painting, toilet partitions & accessories, plumbing, electrical, fire alarm and Modular Building Relocation.

The campuses are at Canalino Elementary School, Carpinteria Middle School and Carpinteria High School. There are (3) different sets of plans and (3) different sets of specs & addendum.

View Event →
Apr
25
2:00 PM14:00

SBHS Peabody Grandstand Replacement, Stadium Renovation, and Site Utilities Upgrade

  • 700 East Anapamu Street Santa Barbara, CA, 93103 United States (map)
  • Google Calendar ICS

Tuesday, April 25, 2017 at 02:00 PM — 02:00 PM

Project name: SBHS Peabody Grandstand Replacement, Stadium Renovation and Site Utilities Upgrade

Project Estimator: Scott Jacobs

Email: sjacobs@schipperconstruction.com

RFI's: Email to Scott Jacobs - DO NOT CALL THE ARCHITECT

Estimated Project Budget for Bid Packages 2, 3, 5, 13, 16, 18, & 19: $11.2M

Job walk and pre-bid conference: Thursday 4/13/2017, 10:30 a.m. Meet at flagpole at Admin/classroom building at SBHS.

Projected Start Date: June 26, 2017

Bid date and time is: April 25, 2017: 2 p.m.

 

This is a PREVAILING WAGE Project. Please fully comply with all bid requirements per the Project Manual, for example: Prequalification, Certified Payroll, compliance monitoring & enforcement, retention, bid withdrawal and/or irregularities, Contractor’s Licensing Statements, DIR Registration, Liquidated Damages, Guarantees, et al. Disable Veteran Business Enterprises (“DVBE”) are specifically encouraged to bid.

 

The Architect’s project description is as follows: “The Peabody Stadium complex at Santa Barbara High School will be renovated so that, at completion, it will feature a new concrete grandstand structure with updated stadium seating and related athletic program space, a new synthetic track, a realigned athletic field with artificial turf, as well as improved accessibility, lighting, sound amplification systems and site underground utilities upgrades, including major storm drainage facilities.”

 

There are a total of 21 bid packages utilizing the “Multi-Prime” project delivery method. Of the 21, Frank Schipper Construction Co. intends to bid on 7 Bid Packages (“BP”).  Please clearly identify your bid by BP number, as defined below:  

                -BP 02: Civil, Grading, Underground Utilities & Site Retaining Walls

                -BP 03: Concrete & Masonry

                -BP 05: Metal Studs, Plaster, Drywall & General Construction

                -BP 13: Architectural Specialties

                -BP 16: Sports Equipment

                -BP 18: Precast Concrete Bleachers

                -BP 19: CFRC Panels (DSA Deferred Approval)

 

All bid documents including Plans and Specifications can be accessed as follows:

  1. Bid documents are available via CyberCopy at: https://www.cybercopyplanroom.com/jobs/96/details/santa-barbara-high-school-peabody-grandstand-replacement-stadium-renovation-and-site-utilities
  2. View bid documents at our office Plan Room at 610 E. Cota Street Santa Barbara between 8:00AM and 5:00 PM
  3. Request a CD: A copy of all current bid documents can be burned to a CD and be mailed or picked up at our office. Please call front desk, or e-mail info@schipperconstruction.com to request a CD. Please note; use our website to check for updates to the bid documents.
View Event →