Apr
8
to Apr 23

Montecito Sanitary District Essential Services Building

 

Bids Due: 4/23/19  @ 12:00 PM

 You can download a set of plans by going onto our SmartBid website or using this link:

                                       https://schipperconstruction.box.com/s/ordoabvqujtlutbo05t789n5m3eahew7

 SCOPE OF WORK The project includes a new, single story, 5,085 net SF essential services building, new curb cut along Channel Drive, 17 space surface parking lot, 4 bike parking spaces, lighting and landscaping. Scope includes selective Site Demolition, Metal Fabrications, rough and finish Carpentry, Architectural Millwork, Insulation. Single Ply Membrane Roofing and Roofing Tiles, Wood doors & hardware,  Aluminum Storefronts, Skylights, interior finishes, light gage metal framing, Lath & Plaster, Ceramic tile, ADA signage, Toilet Accessories, Phenolic Lockers & benches, Postal Specialties, Residential Appliances, Engineered Quartz Countertops, Fire Protection, Plumbing, HVAC distribution & controls, & Electrical including Low Voltage.

   

This project is prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →

Feb
21
to Apr 4

SB Junior High School Heating System Replacement and MPR, Kitchen & Locker Room Building

 

Addendum Notice and BID EXTENSION

NEW Bid date: 4/4/19

THERE IS (1) ADDENDUM on this project. Please be sure to indicate you have seen it in your bid.

This bid is for (2) Separate Projects for the Santa Barbara Unified School District.  Each project has its own set of plans and specifications.  There is one DSA permit for both projects so one contract will be awarded for both projects.  The School District will require separate prices for each project.

Project 1:      Santa Barbara Junior High School Heating System Replacement.

 This project consists of the following:

1)    Demo of existing steam heating system and associated piping within the mechanical room

2)    Rerouting of new hot water supply and return lines from mechanical room to heaters throughout the existing classroom building

3)    The radiant heaters will be removed, refinished and placed back in their existing location

 

Project 2:      Santa Barbara Junior High School MPR, Kitchen & Locker Room Bldg.

 This project includes both demolition and new construction of a Multi-Purpose Room / Kitchen / Locker Room Building on an existing site in Santa Barbara, Ca.

 This project consists of the following:

1)    Demo of existing multipurpose room, kitchen and locker room buildings

2)    Building a New Type IIIB Building consisting of Multi-Purpose Room, Food Service and Locker Rooms

3)    New site work with accessible parking, hardscape, landscape, underground utilities, path of travel and lighting.

Plans can be found using the following link:

https://schipperconstruction.box.com/s/bblwrutgjxl8spdl5mktu5wcb5anwo1w


If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next few weeks; we will notify you on when this jobwalk will occur

 

Please break out your bid based on the following:

 SBJHS Heating System Replacement                             $                                    

 SBJHS MPR, Kitchen & Locker Room                             $                                    

 

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  As of January 1, 2019, at least 50 percent of the skilled journeypersons employed to perform work on the contract or project by the entity and each of its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation that was either approved by the chief pursuant to Section 3075 of the Labor Code or located outside California and approved for federal purposes pursuant to the apprenticeship regulations adopted by the federal Secretary of Labor.

This is a DSA Project

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

SCOPE OF WORK for the Heating System Replacement is:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

 SCOPE OF WORK for the Multi-Purpose Room / Kitchen / Locker Room is:

The scope of work includes building demolition, site clearing, hard and soft demolition, hazardous material abatement, precast concrete piles, landscape & irrigation, asphalt paving, striping, site furnishings, chain link fencing & gates, underground utilities, underground storage tank removal, underslab vapor barrier, concrete rebar, cast in place concrete, structural steel, steel decking, metal fabrications, pipe and tube railings, rough carpentry, glu lams, architectural woodwork, countertops, , finish carpentry, insulation, clay tile roofing, membrane roofing, sheet metal roofing, flashing & sheet metal, roof accessories, firestopping, joint sealants, doors frames hardware, overhead rolling doors, storefront / windows / glass & glazing, tubular skylights, louvers, floor prep, drywall, lath & plaster, tile, acoustical ceilings, cementitious wood fiber ceilings, resilient flooring, fluid applied flooring, painting, high performance coatings, anti-graffiti coatings, signage, toilet partitions & accessories, fire extinguishers, lockers, food service equipment, basketball equipment, window shades (mechoshades), fire sprinkler system, plumbing, HVAC, electrical, communications, fire alarm.

View Event →
Feb
13
to Mar 4

Rancho Alegre Phase I

 

This project consists of the following:  Phase I rebuilding of one story wood framed buildings after damage in Whittier Fire.  The buildings consist of the following:

* (4) Dorm Buildings - 8520sf
* (1) Health Center Lodge - 1125sf
* (2) Outdoor School Staff Housing - 3510sf
* (3) 2-bedroom Staff Housing (no garage) -2400sf
* (2) 2-bedroom Staff Housing (with garage) - 1600sf
* (1) 3-bedroom Staff Housing - 1100sf


Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/39kp7ihp7mfefc78qj2xwk6pv1xlbodj

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs (sjacobs@schipperconstruction.com)
 
SCOPE OF WORK:
The scope of work includes foundation concrete, slab on grade concrete, masonry, rough carpentry, finish carpentry, cabinetry, insulation, SIPS Panels, waterproofing, metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead garage doors, windows, drywall, fiber cement siding, epoxy flooring, vinyl plank flooring, painting, staining, toilet accessories, fire extinguishers, signage, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical.

View Event →
Feb
8
to Feb 22

Restaurant TI at Coast Village Road

 

This project consists of a 1500sf Restaurant Tenant Improvement to Suite 7 located in the upper level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found on Smartbid or using this link: https://schipperconstruction.box.com/s/vgnkz3whwukw9ewq92a0ih22dd8hzqgr


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, rough carpentry, finish carpentry, cabinetry, countertops, insulation, FRP installation, roofing, doors frames hardware, glass & glazing, metal stud framing, drywall, acoustical ceilings, ceramic tile, painting, toilet accessories, lockers, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical. 

View Event →
Jan
29
to Feb 19

421 Pine Ave T.I.

 

You can download a set of plans by going onto our SmartBid website or using this link: https://schipperconstruction.box.com/s/50bhn0ieik4ishtplpohu5zmc2ccrnjy

SCOPE OF WORK. Tenant Improvement of 7,904 SF including: Exterior concrete flatwork, & ADA upgrades, soft demo, interior finishes, light gage metal framing, rough framing at new skylights, finish carpentry, millwork & countertops, minor structural steel for countertop reinforcement, insulation, roof patch, drywall, interior doors, frames & hardware, ceramic tile, bath accessories & partitions, Glass/glazing/skylights, acoustic ceilings, carpet & resilient flooring, painting, ADA signage, fire protection, plumbing, HVAC new rooftop unit, HVAC distribution & controls, & electrical.

 This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jan
21
to Feb 11

Carpinteria City Hall Renovations T.I. 5775 Carpinteria Ave

 

You can download a set of plans by going onto our SmartBid website or using this link:

                                      
https://schipperconstruction.box.com/s/slj8s78hrz7dnlzsmkmjax6bm1ybwpnb

 

 SCOPE OF WORK.  Interior/exterior renovations of an existing 11,000 sf single story building in downtown Carpinteria consisting of: site & architectural concrete, unit pavers, underground utilities, landscaping, site furnishings, soft & hard demo, interior finishes, light gage metal framing, wood framing, structural steel,  aluminum handrails, insulation, roof patch, drywall, interior doors, frames & hardware, acoustic ceilings & suspended wood ceilings, doors & hardware, millwork/cabinets & countertops, glass & glazing, carpet & vinyl flooring, painting, ceramic tile, ADA signage, toilet partitions & accessories, metal roofing and insulation, fire protection & alarm, plumbing, HVAC & controls, & electrical.

ARCHITECTS PROJECT DESCRIPTION: Description: Interior TI. Accessibility upgrades, remediation of sewer backup damage. Removal of vinyl asbestos tile by owner.

 This project is prevailing wage. DIR # is required w/ bid.

 MBW / WBE / DVBE Contractors are encouraged to bid

Last day to submit RFIs is January 25, 2019.

 

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

View Event →
Jan
21
to Feb 8

Fleishmann Auditorium Refresh

 

The project involves the Refresh of the approximate 7,900 square foot Fleishmann Auditorium at the Santa Barbara Museum of Natural History. The scope of work includes selective demolition, landscaping, misc. carpentry, Misc. Metal and railing, new clay tile and PVC roofing, sheet metal, doors and hardware, mirrors, new window film, drywall, acoustical treatments, patch and refinish wood flooring, carpeting, painting, new stage curtain, roller shades, new Wheel Chair Lift, removal and replacement of existing HVAC, electrical, and lighting.

Link to the plans below.

https://schipperconstruction.box.com/s/6fcf2vnpq3vfnif1euuzl26aovsnm0ni

View Event →
Jan
8
to Jan 16

Tapjoy/Cameron Pacific Tenant Improvements

 

Bids Due: 1/29/2019 @ 02:00 PM

 

THIS PROJECT BIDS on 1/29/2019 at 2:00pm

This is a tenant improvement to create offices for Tapjoy/Cameron Pacific & will combine Suites A10-14 into one suite. Tenant improvements consist of three offices, conference room, break room, and copy room. Interior improvements only.


The scope of work includes soft demolition, finish carpentry, cabinetry & countertops, insulation, doors frames hardware, metal stud framing & drywall, acoustic ceiling, glass/glazing, ceramic tile & stone, PL countertops, Caesar-stone countertops, carpet/flooring, LVT flooring and base, painting, fire sprinkler relocation, plumbing, HVAC and electrical.

You can download a set of plans by going onto our SmartBid website or using this link:        https://schipperconstruction.box.com/s/158msjtirggpid0r284x04ohfm18tucx.

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Dec
27
to Jan 22

Lompoc Extraction Lab

 

THIS PROJECT BIDS  on 1/22/19 at 3:00pm

This project consists of the following:

Development of a Cannabis Extraction Lab in the interior of an existing building. 

Please note that there are Two Phases on the plans and bids will have to be priced accordingly 
(Phase I $_______ Phase II $_______)



If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

https://schipperconstruction.box.com/s/p0v7h2xugqfb199lhqemi5y3vv0l06d9


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, surveying, misc. site clearing, tree removal, tree pruning, road base installation, site concrete, parking lot striping, truncated domes, site signage, concrete footings & slab, heavy duty metal framing, structural steel, metal decking, rough carpentry, finish carpentry, cabinetry, insulation, doors frames hardware, windows, metal stud framing, drywall / sureboard, acoustical ceilings, painting, signage, lockers, kitchen equipment, pre engineered metal building rework, plumbing, HVAC, Electrical, security.

View Event →
Dec
17
to Jan 4

Cameron Pacific Tenant Improvements

 

THIS PROJECT BIDS  on 12/27/18 at 2:00pm

This project consists of the following:

This is a tenant improvement to create offices for Cameron Pacific.  Please see the revised layout where there are (4) Private Offices and an Open Office.  The conference room shown on A2.1 has been deleted.  Acousitcal ceilings will no longer be needed as the Owner has elected use R30 Insulation with Black Scrim Paper for the ceiling.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

https://schipperconstruction.box.com/s/hjtgukr1gnka8090x2jrlgqd1fpdgk3k

PLEASE SEE THE ATTACHED OWNER SCOPE SHEET FOR A MORE DETAILED DESCRIPTION OF THE WORK

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, finish carpentry, cabinetry & countertops, insulation, doors frames hardware, metal stud framing & drywall, flooring, painting, fire sprinkler relocation, plumbing, HVAC and electrical.

View Event →
Dec
11
to Jan 4

Intuitive Surgical Tenant Improvements

 

Bids Due: 12/21/18 @ 02:00 PM

You can download a set of plans by going onto our SmartBid website or using this link:

                                       https://schipperconstruction.box.com/s/lsmj4ddb30k5azt93jj022d8ryipx7jj

 

SCOPE OF WORK. Tenant Improvement of 4,836 SF including: soft demo, interior finishes, light gage metal framing, minor structural steel for purlin reinforcement, insulation, roof patch, drywall, interior doors, frames & hardware, acoustic ceilings, carpet flooring, painting, ADA signage, fire protection, plumbing, HVAC new rooftop unit w/ screening, HVAC distribution & controls, & electrical.

 This project is NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Dec
5
to Dec 12

Sunburst Winery

Remodel of an existing 1,320 commercial building to create a new Wine Tasting Room. Project includes the interior remodel including a kitchen, walk-in cooler, Service Bar, Retail Area, new accessible restroom. Exterior improvements include new deck with fire pit, handicap ramp, new landscaping and repave and stripe parking lot. 
Project scope includes demolition, asphalt paving and striping, concrete, steel, cablerail, framing, sheet metal, FRP{, drywall, plaster cabinets and countertops, solid surfaces, acoustical ceilings, wood flooring, tile, epoxy flooring, paint, doors, overhead door, windows, toilet accessories, Plumbing, HVAC, Electrical Kitchen and Bar Equipment.

Plans can be found on the following link: https://schipperconstruction.box.com/s/ovznswk7o7wgd50vv95kpk2iww6nosp3

View Event →
Nov
15
to Jan 16

SB MTD Transit Center Renovation

This project consists of the following:  Overhaul an existing 15,200 sf site in downtown Santa Barbara consisting of improvements of a single story concrete block, metal and glass building with metal roofing; replacement of a concrete loading platform and driveway surface; new underground utility services and site lighting; all new landscaping; temporary facilities; and offsite improvements including new sidewalk, curb & gutter.

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/i8scn5hpkp53r119x55h9b8i2wjh8eyw

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Phil Orr (phil@schipperconstruction.com

SCOPE OF WORK:

The scope of work includes hard and soft demolition, haz mat abatement, site concrete, brick paving, landscaping, slab on grade concrete, architectural concrete, metal fabrication, rough carpentry, finish carpentry, architectural woodworking, TPO Roofing, waterproofing, metal wall panels, batten seam metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead coiling door, storefronts / glazing, metal stud framing & drywall, plaster, tile, acoustical ceilings, carpeting, sound absorbing ceilings, painting, staining, high performance coatings, toilet partitions / accessories, fire extinguishers / cabinets, solid plastic lockers, cubicle tracks & curtains, outdoor furniture, fire sprinklers, plumbing, HVAC, electrical, fire alarm, data, communications, security.

View Event →
Sep
13
to Sep 21

Rosewood Miramar TI

 

THIS PROJECT BIDS  on 9/21/18 at 3:00pm

This project consists of the following:

Tenant Improvement of (E) 1925sf Guest Services Retail Building (mercantile) with 136sf Covered Porch

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/7yjnkjjkqtnswdc6egpw7r2wfvx7i216

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, cabinetry / woodworking, rough carpentry, finish carpentry, insulation, doors, frames, hardware, mirrors, concrete topping for flooring, rubber topset base, painting, ceiling access panels, signage, curtains, fire sprinklers, plumbing, HVAC, Electrical.

View Event →
Sep
13
to Oct 2

HERBAY PHARMACY T.I.

 

HERBAY PHARMACY T.I.

5340 Hollister Ave, Suite A

Goleta, CA 93111

 Bids Due: 10/2/18 @ 02:00 PM

  

  You can download a set of plans by going onto our SmartBid website or using this link:     https://schipperconstruction.box.com/s/p5v98jgs5ucxmqfxdy8ame748bvshp2c

 

SCOPE OF WORK. Tenant Improvement of 2,482 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, flooring, glass glazing, acoustic ceilings, painting, plumbing, HVAC distribution and controls, & electrical.

 

This project is  NOT prevailing wage

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
10
to Sep 18

St. Louis de Montfort Church Exterior ramps, Vestibule renovations

 

You can download a set of plans by going onto our SmartBid website or using this link:                                        https://schipperconstruction.box.com/s/hzhrd11vhoxv2mqgemra3r06byf03rla

 SCOPE OF WORK. Exterior replacement of existing non-compliant concrete ramps with new accessible concrete ramps, stairs, curbs and pipe guardrails/handrails. Interior vestibule renovations of 900 SF including: soft demo, interior finishes, wood framing (remodel), drywall/plaster patch, interior doors renovation, door hardware, aluminum windows, ceramic tile/stone, Veristone trim, painting, electrical, landscape repair and landscape lighting.

 This project is  NOT prevailing wage.

 MBW / WBE / DVBE Contractors are encouraged to bid

 FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Sep
6
to Sep 18

9 E Pedregosa

 

Here is some of the project information. It includes, but is not limited to:

SCOPE OF WORK. Tenant Improvement of 2,770sf including: soft demo, interior finishes, light gage metal framing, insulation, drywall, interior doors, frames & hardware, acoustic ceilings, flooring, painting, fire protection, plumbing, HVAC distribution and controls, & electrical.

Plans are available at this link: https://schipperconstruction.box.com/s/y5hgfmcdim8062fugsm42g8llcf8iwoo or from our SmartBid website. 

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com . We will have a hard copy set of plans in our plan room

Please direct all questions and RFIs to arlan@schipperconstruction.com

You can respond by clicking on one of the links above to let us know your intentions.

If you have any questions regarding this project, please contact me.

View Event →
Aug
31
to Sep 11

Fairview Shopping Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/3ibv82c38b4hbz75rqjlswpeqa1tw38u

SCOPE OF WORK. Exterior refresh of shopping center to include parking lot slurry seal, curb repainting and re-striping; prepare and repaint of 7 existing buildings plus monument signage, clock signs and trash enclosures. All shopping center tenants to remain open during construction. Coordinate the work with all loading and delivery schedules for the tenants. Provide customer pedestrian and traffic control to protect the areas of work, shopping center patrons and vehicles. Landscaping to remove existing climbing vines. Clean the prefinished metal surfaces per manufacturer’s recommendations (no power washing.) Clean and power  wash existing colored block to remain.

This project is  NOT prevailing wage.

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Aug
22
to Sep 13

Funk Hostel @ 134 Chapala St

 

This project consists of the following:

* Tenant improvements to interior of existing commercial building (no change of use or square footage added)
* Renovate existing mechanical, electrical & plumbing
* Replace all exterior doors and windows in place.  Remove existing windows and doors
* Repair / replace existing exterior fabric awnings
* Replaster exterior of existing building
* Restripe existing ADA Parking space for van access

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found using this link:  https://schipperconstruction.box.com/s/nc8sbr8tjnuagfsrtxpx3igm3tijst1j

Please see the attached bid form indicating which items are alternates

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, masonry, misc. metals (awnings), rough carpentry, finish carpentry, cabinetry / millwork, insulation, roofing, sheet metal, storefront entry, doors frames & hardware, plaster, drywall, concrete floor seal, tile & stone, painting & staining, toilet partitions / accessories, signage, fire extinguishers, bike racks, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
24
to Aug 21

El Prado - La Quinta Inn & Suites

 

This project consists of converting an existing 3-story, 56 Room Hotel to a remodeled / new 3-Story, 122 Room Hotel with with a pool/spa courtyard area at the ground floor and one sub-grade basement parking level connecting to the existing garage.  The new Hotel will have 124 parking spaces, new lobby, dining, kitchen and exercise rooms.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction. We will have a hard copy set of plans in our plan room

Electronic Plans can be found using this link: https://schipperconstruction.box.com/s/km3ko01r327a4jumla0zcucinz1rw6ls

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com) & Phil Orr (phil@schipperconstruction.com)

The scope of work includes earthwork and site clearing, hard and soft demolition, underground utilities, landscape & irrigation, tower crane, shoring, scaffolding, fencing, site concrete, pavers, wood decking, gravel pathway, tree grates / misc. metals, water features, pool & spa, synthetic turf, bike racks, ceramic pots, a green roof (live roof), tree relocation & removal, SWPPP, surveying, foundation / slab / wall & deck concrete, lightweight concrete, CMU & GFRC / Precast, structural steel, prefabricated stairs, handrails, ornamental iron, glass railing, rough carpentry, finish carpentry, cabinetry / millwork, solid surfaces, sheet metal, waterproofing, insulation, TPA roofing, pedestal pavers, doors frames hardware, storefront / windows, skylights, smoke curtains, lath & plaster, metal stud framing & drywall, ceramic tile, acoustical ceilings, vinyl & carpet flooring, sealed concrete floors, wood flooring, painting, wall covering, toilet partitions & accessories, misc. specialties, food service equipment, laundry equipment, elevator, fire sprinklers, plumbing, HVAC, electrical / low voltage.

View Event →
Jul
23
to Aug 6

5340 Hollister Ave. Tenant Improvements

 

This project consists of the following:

Remodel of existing 2271sf tenant space in (E) 4791sf building.   This project includes the installation of a demising wall to create two separate units, new ADA restrooms, HVAC Equipment, plumbing and electrical fixtures, new finishes in Suite 101 and new ADA Parking Signage.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans for this project can be found here: https://schipperconstruction.box.com/s/9s7gg0fli7lknm5geftjdd9lon4xycvm

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, slab on grade concrete, rough carpentry, finish carpentry, insulation, roof patching, sheet metal, storefront entry, doors frames & hardware, metal stud framing, drywall, sheet vinyl flooring, acoustical ceilings, painting & staining, toilet partitions / accessories, signage, fire extinguishers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Jul
20
to Aug 14

CLUB PILATES, 5 Points Center

 

You can download a set of plans by going onto our SmartBid website or using this link:                           https://schipperconstruction.box.com/s/5mg4zhpnfb2crg8je4qdu3bsb9fk6lhr

SCOPE OF WORK. Tenant Improvement of 1,890 SF including: interior finishes,  light gage metal framing, insulation, drywall, interior doors, frames & hardware, mirrors/glass glazing, acoustic ceilings, painting, toilet accessories, fire protection, plumbing, HVAC distribution and controls, & electrical.

This project is  NOT prevailing wage

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com. (805) 963-4359 x 116

 

View Event →
Jun
14
to Jul 11

Santa Barbara High School Boiler Replacement and HVAC Revisions

 

Project name:  Santa Barbara High School Boiler Replacement and HVAC Revisions

Preconstruction Manager: Erwin Villegas

Email: erwin@schipperconstruction.com

Additional Information:

Submit RFI's by Email to Erwin Villegas - DO NOT CALL THE ARCHITECT

Check website regularly for addendums issued during the bid period.

 Estimated Project Budget: $6,000,000

Projected Start Date: August 2018

Bid date and time: 7/11/18 at 3:00PM

This project consists of the following:  Replace Existing steam boiler system at Main building and 20’s/30’s Wings, Gymnasium Building and Field House with Hot Water Boiler System, including associated plumbing and electrical work as follows:

1) Main Building and 20’s / 30’s Wings:

Replace (E) Steam Boiler in Basement Boiler Room with Hot Water Boiler

Restore (E) Radiators in Classrooms and Offices

Replace (E) Fan Unit w/ Individual Fan Coil Units in Framed Soffits in 20’s Wing

Replace (E) Radiators w/ individual Fan Coil Units in Framed Soffits in 30’s Wing

Replace (E) Radiators w/ Heat Pumps in Framed Closets at Computer Rooms 34 and 35

Replace (E) Rooftop Mechanical Units at Auditorium, Old Gym and Classrooms

2) Gymnasium Building

Restore (E) Radiators in Support Spaces

Provide New Rooftop Mechanical Units and Associated Ductwork at Gymnasium

Provide New Mechanical Units at Basement Level

3) Field House

Remove (E) Steam Boiler in Basement Boiler Room and Associated Piping

Remove (E) Radiators in Classrooms and Offices

Remove (E) Suspended Heaters in Locker Rooms

Replace (E) Suspended Acoustical Panel Ceilings & Lighting in Classrooms and Office

Install New Rooftop Mechanical Units for Locker Rooms, Classroom and Offices


Plans, Specifications & Addendum can be found using the following link:https://schipperconstruction.box.com/s/pdwdoh2kc8dzwkq1gt80ktf4aiwdkcjx

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

A mandatory jobwalk will be scheduled in the next week; we will notify you on when this jobwalk will occur

Please break out your bid based on the following:

Main Building, 20’s / 30’s Wing                                         $ _________________

Gymnasium Building                                                          $ _________________           

Field House                                                                         $ _________________                                             

SB 693 is now in effect and all contractors working on this project must work to comply with these requirements.  Contractor agrees that skilled journeypersons employed to perform work on the Project by Contractor or its subcontractors at every tier are graduates of an apprenticeship program for the applicable occupation at the following percentages per Section 2601:  At least 40 percent for work performed on or after January 1, 2018

This is a DSA Project

This project is PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)
 

SCOPE OF WORK:

The scope of work includes hard and soft demolition, hazardous material abatement, concrete, structural steel / misc. metals, rough carpentry, finish carpentry, insulation, roofing, doors & frames, plaster, drywall, acoustical ceilings, flooring, painting, louvers / vents, access panels, Fire Sprinklers, Plumbing, HVAC, Electrical

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code. SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17405.7, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
31
to Jun 15

UCSB Trace Metals Clean Rooms

NOTICE TO CONTRACTORS CALLING FOR BIDS

Notice is hereby given that bids will be received by Frank Schipper Construction Co. via email (arlan@schipperconstruction.com) or via fax (805) 963-1270 no later than:

Wednesday, June 13, 2018 at 4:00pm for UCSB Trace Metals Clean Rooms

Plans and Specs may be viewed/downloaded through the link https://schipperconstruction.box.com/s/c53ky739rxqos4wgxji63fqxwzjbm30r  

The project description is as follows:

Construction of a +/- 1,040sf new ISO certified cleanroom laboratory suite for the Department of Earth Science that will be housed on the 2nd floor of an existing building on the University campus.

Projected project budget is $3,000,000.

Projected start date is July 2018

Projected project duration is estimated at 7 months.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

SKILLED AND TRAINED WORKFORCE: Subcontractor shall comply with Education Code Section 17407.5, which requires Subcontractor and its subcontractors at every tier to employ a skilled and trained workforce to perform all work on this Project that falls within an apprentice-able occupation in the building construction trades. Subcontractor shall submit Skilled and Trained Workforce Compliance Report with Progress Billings each month. Billings will not be accepted without the Reports. Skilled and Trained Workforce Requirements are for Prime Subcontractors only (1/2 of 1% of Total Contract.)

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
11
to May 31

SB Junior High School Multi-Purpose Room Demo & Site Clearing

 

Preconstruction Manager: Arlan Schipper

Email: arlan@schipperconstruction.com

Estimated Project Budget: $500,000

Projected Start Date: June 25, 2017 (See summary schedule on website for additional information)

Bid date and time: May 31, 2018 @ 2 p.m.

Plans can be found using this link: https://schipperconstruction.box.com/s/zsabuef5zptlaqf32siwgwvom0d2gf3k

Project Description:

This is a Prevailing Wage project consisting of the demolition of 2 existing buildings, including foundations, totaling approximately 20,000sf and associated site clearing of approximately 26,500sf for the eventual construction of a new 15,000sf Multi-purpose room.

All Mechanical, Electrical, and Plumbing trades must be prequalified with Santa Barbara School District to provide a bid on this project.

Pursuant to the provision of Section 1773 and 1773.2 of the Labor Code of the State of California, the District has obtained from the Director of Industrial Relations, the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work is the locality in which the work is to be performed for each craft, classification or type of workman needed to execute the contract. It shall be mandatory upon the contractor to whom the contract is awarded, to pay not less that the said specified rates to all workmen employed by them in the execution of the contract, and to comply with the prevailing wage requirement set forth in the Labor Code.

Pursuant to the provisions in Section 1711.1 of the Labor Code of the State of California, a contractor shall not be qualified to bid or engage in the performance of any contract for this project unless; (1) currently registered and qualified to perform public work pursuant to Section 1725.5; or (2) expressly is authorized to submit a bid by Section 1771.1 and provided the contractor is registered to perform public work pursuant to section 1725.5 at the time the contract is awarded.

This project is subject to the compliance monitoring and enforcement by the Department of Industrial Relations.

View Event →
May
10
to May 22

2034 Cliff Drive Shell

 

This project consists of the following:

The existing tenant space will be converted into (2) separate tenant spaces.  Remodel to include new roofing, new entrance and storefront on south side of building, new accessible path, (4) new windows, exterior paint & stain, new accessible restrooms, interior walls & finishes.  No new square footage proposed.  Existing parking to remain.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

The link to the plans can be found here: https://schipperconstruction.box.com/s/ki2fuez5mlus9vfku4uph5hwnj3mu0yd

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, site concrete, foundation concrete, slab on grade concrete, ornamental iron / misc. metals, rough carpentry, finish carpentry, insulation, roofing, sheet metal, glass & glazing, doors frames & hardware, lath & plaster, metal stud framing, drywall, ceramic tile, painting & staining, toilet partitions / accessories, signage, fire extinguishers, awnings, plumbing, HVAC and Electrical.  

View Event →
Apr
30
to May 8

ParadICE Hawaiian Shave Ice T.I.

 

The scope of work on this project consists of:
Soft demolition and tenant improvements of 450sf from existing salon to specialty food service.

The trades include soft demolition, rough carpentry / wood framing, truss joists, finish carpentry, millwork & cabinetry, insulation, doors frame hardware, fixed louvers, drywall, toilet partitions & accessories, Caesar-stone countertops, HVAC, plumbing & electrical.

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Scott Jacobs. sjacobs@schipperconstruction.com.  (805) 963-4359 x116

Plans can be found here: https://schipperconstruction.box.com/s/p0na6i033czulq003jy61wjl9euv84yh

 

View Event →
Apr
3
to Apr 20

SB Zoo Giraffe Barn

 

This is a new 1300 square foot Giraffe Barn located at the existing exhibit inside the Santa Barbara Zoo.  The barn consists of caissons and grade beams for the foundation, a concrete slab and structural steel with wood framing for the structure.  The roof will be a Sarnafil TPO Single Ply Membrane Roof and tie interior / exterior walls will have galvanized metal panels and the exterior walls will be plastered.  There are details for a structural steel animal management system included in this set of plans.

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
https://schipperconstruction.box.com/s/4vgmacuyo2ttlaka33epa7dxuzkxcy9o


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)


The scope of work includes earthwork and site clearing, hard and soft demolition, caissons, foundation concrete, slab on grade concrete, stonework, structural steel, unistrut animal management system, wood framing / rough carpentry, Icynene insulation (walls & ceilings), single ply TPO roof membrane, sheet metal, doors frames hardware, windows glass & glazing, plastering, painting, HVAC, Plumbing, Electrical

View Event →
Feb
28
to Mar 14

Khao Kaeng Tenant Improvements (Empty Bowls)

 

This project consists of a new 1300sf Restaurant Tenant Improvement to Suite 9 located in the lower level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
Plans can be found using this link: https://schipperconstruction.box.com/s/7lcsicy29wi8mf3sg3qk0gnktlnrn6wg

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, concrete patching, ornamental iron, misc. metals, rough carpentry, finish carpentry, cabinetry, solid surface countertops, insulation, FRP installation, roofing, glass & glazing, metal stud framing, drywall, acoustical ceilings, polished concrete flooring, LVT Flooring (alternate), painting, signage, fire extinguishers, lockers, fire sprinklers, plumbing, HVAC and Electrical.  

View Event →
Feb
21
to Mar 7

Coast Village Plaza HVAC

 

This project consists of installing new HVAC Equipment / Distribution to the Suites located in Coast Village Plaza.  
The work is located in both the Lower and Upper Levels of the Plaza.

Plans can be found here: https://schipperconstruction.box.com/s/bei6qkxngj4g1ukwealjg1jmfurn3c5a

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, structural steel, rough carpentry, finish carpentry, roofing, doors frames hardware, metal stud framing, drywall, painting, HVAC and Electrical.  

View Event →
Feb
13
to Feb 22

1290sf TI for LGS

 

This project consists of a 1290sf Tenant Improvement for LGS, (defense contractor) and consists of a 2nd floor tenant improvement for a new conference room and electronic lab.  

Because this work is for a military defense contractor, workers must be a US Citizen and will need to bring proof using a valid US Passport when working on this project.

Plans can be found using this link:https://schipperconstruction.box.com/s/u22phxuws1ketyalb3syhs4463fuig71

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition framing, rough carpentry, finish carpentry, insulation, doors frames hardware, drywall, acoustical ceilings, flooring, painting, HVAC and Electrical.  

View Event →