Back to All Events

Starbucks at Hotel Californian


  • Frank Schipper Construction Co. 610 East Cota Street Santa Barbara, CA, 93103 United States (map)

* Bids are due April 26th at 3:00PM

This project consists of the following:  

This project is a Tenant Improvement to an existing 1137sf commercial space to include the following:

 

Exterior:

                Alterations to Existing Storefront to provide double door at entry

Interior:

                New single occupancy accessible restroom

                Non load-bearing partition walls

                New kitchen equipment

                New plumbing & electrical

                New built-in cabinetry

                New POS Counter

                New dropped ceiling / acoustical ceiling

 

Please refer to the Interior Design Drawings to determine what will be furnished by Starbucks

 

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/pweowbp79bjsi28qjdqyizvb2j60nmdx

If you have trouble accessing the files, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

 
SCOPE OF WORK:
The scope of work includes hard demolition, site demolition, rough carpentry, finish carpentry, cabinetry, millwork, countertops, insulation, caulking & joint sealants, doors frames hardware, storefront, metal stud framing, drywall, FRP, flooring, tile, acoustical ceilings, wood slat ceilings, toilet accessories, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC, electrical, fire alarm

Earlier Event: February 8
Sanctuary Housing & Medical Centers