Back to All Events

Goleta Valley Cottage Hospital – Kitchen Upgrades


  • Frank Schipper Construction Co. 610 East Cota Street Santa Barbara, CA, 93103 United States (map)

Goleta Valley Cottage Hospital – Kitchen Upgrades

351 South Patterson Ave.

Santa Barbara, CA 93111


Bids are due August 26 at 3:00PM

This project consists of the following:  

This project is an equipment replacement.  Remove the existing dishwasher machine and install an in-kind dishwasher machine and its associated components, including related mechanical, plumbing and electrical work.  Minor electrical upgrades in the kitchen.  Patch and repair finishes disturbed during construction to match existing adjacent surfaces.

  

Plans can be obtained on Smartbid or the following link:

https://schipperconstruction.box.com/s/81fl9nac9bg608nzoe1adaya00c7q2t1


If you have trouble accessing the files, please contact us at info@schipperconstruction.com.

MBW / WBE / DVBE Contractors are encouraged to bid

This project is NOT Prevailing Wage

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

SCOPE OF WORK:
The scope of work includes soft demolition, misc. steel (angle iron), seismic framing / seismic anchoring, stainless steel wall panels, insulation patch, drywall, painting, food service equipment, plumbing, HVAC, Electrical.