* Bids are due February 17, 2026 at 2:00PM
This project consists of the following:
Removal and replacement of existing windows at Buildings A, B, C, D, E and F. Existing window openings will require minor modifications to accept new dual glazed aluminum windows
Removal and reinstallation of existing toilet accessories at Buildings A, B, C, D, E & F as required to meet current code requirements
Removal and replacement of existing restroom signage at Buildings A, B, C, D, E & F
Removal and replacement of existing non-accessible decorative metal entrance gate
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/finev1uj4ps4kfyqlz9j5rv17yzhcdjl
If you have trouble accessing the files, please contact us at info@schipperconstruction.com.
MBW / WBE / DVBE Contractors are encouraged to bid
This project is Prevailing Wage
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
SCOPE OF WORK:
The scope of work includes demolition, rough carpentry, finish carpentry, thermal & moisture protection, wood frame repair, aluminum windows, plastering, drywall, painting, signage, toilet accessories and decorative metal fences and gates.
