Brisa Encina Housing Development


  • Frank Schipper Construction Co. 610 East Cota Street Santa Barbara, CA, 93103 United States (map)

Project – 1490 Burton Mesa Blvd. Lompoc – BRISA ENCINA RESIDENTIAL DEVELOPMENT

FRANK SCHIPPER CONSTRUCTION CO.  Is requesting your bid for the project listed below for the remodel of an existing commercial building into a new Brisa Encina Housing Development.

 

This Project is: Prevailing Wage. Higher of Federal Davis Bacon or State Residential Prevailing Wages.

 

Please respond to this Bid Invitation to let us know if you WILL or WILL NOT be bidding

AGENCY:                          Housing Authority of Santa Barbara

PROJECT NAME:              Brisa Encina

LOCATION:                       1490 Burton Mesa Blvd. Lompoc CA, 93436

BID DUE:                           Tuesday November 10, 2026 @ 2pm

EMAIL BID:                    rmorales@schipperconstruction.com  

 

FOR PLANS & SPECS:       Click on link below:

                                             BRISA ENCINA PLANS & SOILS REPORTS

Description of  Work:

  • This project consists of a new 49 unit Multi-Family residential development consisting of (2)- 2 Story apartments and 6 Duplexes all of which are modular buildings built in factories offsite.

  • The modular units will be delivered to the site from the factories with doors and windows and exterior waterproofing installed.

  • The on-site work that will need to be completed includes the foundations, framing of exterior stairs, mansard roof, parapets and covered walkways and eyebrows and other carpentry details. 

  • Also sheet metal flashing, gutters, roofing, lath plaster, tile accents, painting and connection to the factory installed Fire Sprinklers, Mechanical, Plumbing and Electrical.

  • The Sitework consists of site clearing and grading, utilities, hardscape, site concrete and masonry, asphalt paving, signage, fencing and gates, landscaping and irrigation and site accessories. 

  • Common Areas: All common area finishes will need to be priced and included in your bids to include: Corridors flooring, drywall, paint, & finishes; Common areas Cabinets & finishes; Common areas Windows/ arched windows and doors/frames / hardware (see door and window schedule).

  • Fire sprinklers & Fire Alarm systems to be priced and installed (see FS & FA plans).

Project Info:

  • We are seeking Certified and Qualified subcontractors and suppliers who are: MBE, WBE, SBE, DBE DVBE and Section 3, with the requirement that 5% of total contracts be awarded to DVBE’s.

  • Bid Documents can be viewed and downloaded from Smartbid or the following link above. They can also be accessed in the Subcontractor Center on our Webpage at www.schipperconstruction.com

Additional Project Info:

  • Anticipated Start date 1st quarter of 2027

  • Approx. Completion in 18 months (4th quarter of 2028)

  • Liquidated Damages: The Housing Authority’s contract includes liquidated damages of $2,500 per calendar day.

See plans and specs in the link above for details.

Forward questions to: Ron Morales at rmorales@schipperconstruction.com  or call 805-963-4359