Midland School Restroom Improvements - (3) Projects


  • Frank Schipper Construction Co. 610 East Cota Street Santa Barbara, CA, 93103 United States (map)
 

·         Bids are due January 15 at 3:00PM


These are three projects that will need to be bid separately and will consist of the following:  

The Upper Yard Restroom is a 2,220 GSF single level structure with three separate sink/shower/toilet areas, a common laundry room and a single-occupant restroom.  The project replaces four existing restrooms and removes three existing cabins.  A separate 163 GSF shed and site retaining walls are also part of the project.

The Lower Yard Restroom #1 is a 986 GSF single level structure with one sink/shower/toilet area, a common laundry room and single-occupant restroom.  The project replaces an existing restroom located in the vicinity.  A separate 55 GSF shed is also part of the project.

The Lower Yard Restroom #2 is a 1,064 GSF existing building to be renovated.  A separate new 106 GSF shed is also part of the project.

 Please break out your bid based on the following:

Midland School Upper Yard Restroom Improvements                 $                                                             

Midland School Lower Yard Restroom Improvements                 $                                                             

Midland School Lower Yard Restroom Renovation                       $                                                             

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/qpdnli1up1fq12dcbpd6c68tlil4ogyh

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is NOT PREVAILING WAGE

MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com

SCOPE OF WORK:
The scope of work includes hard demolition, site demolition, surveying, earthwork, SWPPP, AC paving, pavement markings, site concrete, underground utilities, building concrete, rough carpentry, finish carpentry, cabinetry, waterproofing, insulation, roofing, flashing & sheet metal, roof accessories, skylights, caulking & joint sealants, fire caulking / fireproofing, doors frames hardware, windows, drywall, tile, epoxy flooring, painting, toilet partitions & accessories, signage, fire extinguishers, louvers, fire sprinklers, plumbing, HVAC, and Electrical.