Back to All Events

Restaurant TI at Coast Village Road


 

This project consists of a 1500sf Restaurant Tenant Improvement to Suite 7 located in the upper level of Coast Village Plaza.  

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

Plans can be found on Smartbid or using this link: https://schipperconstruction.box.com/s/vgnkz3whwukw9ewq92a0ih22dd8hzqgr


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, rough carpentry, finish carpentry, cabinetry, countertops, insulation, FRP installation, roofing, doors frames hardware, glass & glazing, metal stud framing, drywall, acoustical ceilings, ceramic tile, painting, toilet accessories, lockers, signage, fire extinguishers, kitchen equipment, fire sprinklers, plumbing, HVAC and Electrical. 

Earlier Event: January 29
421 Pine Ave T.I.
Later Event: February 13
Rancho Alegre Phase I