Bid Schedule is as follows:
* Bids are due January 9th
This project consists of the following:
This project proposes replacement of the roofing material of the upper and lower flat roofs, and replacement of existing rooftop HVAC and exhaust fans of the Collections & Research Center (CRC). All equipment will be replaced, like-for-like, with the exception of (2) HVAC units which will be reused.
Reconfiguration of the HVAC equipment on the CRC roof allows for the addition of solar panels (which will be hidden from view by the parapet walls). The addition of the solar panels will be submitted under a separate permit.
Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/4eugzojxsvyxqy1ysxrek5s02en2oc79
If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room
This Project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas erwin@schipperconstruction.com
The scope consists of the following:
Soft demolition, rough carpentry / framing, insulation, roof flashing / sheetmetal, roofing, Photo Voltaic System (under separate permit), HVAC, plumbing & electrical.