Lompoc Extraction Lab


 

THIS PROJECT BIDS  on 1/22/19 at 3:00pm

This project consists of the following:

Development of a Cannabis Extraction Lab in the interior of an existing building. 

Please note that there are Two Phases on the plans and bids will have to be priced accordingly 
(Phase I $_______ Phase II $_______)



If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

https://schipperconstruction.box.com/s/p0v7h2xugqfb199lhqemi5y3vv0l06d9


This project is NOT PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid
FSCC Estimator: Erwin Villegas (erwin@schipperconstruction.com)

The scope of work includes soft demolition, hard demolition, surveying, misc. site clearing, tree removal, tree pruning, road base installation, site concrete, parking lot striping, truncated domes, site signage, concrete footings & slab, heavy duty metal framing, structural steel, metal decking, rough carpentry, finish carpentry, cabinetry, insulation, doors frames hardware, windows, metal stud framing, drywall / sureboard, acoustical ceilings, painting, signage, lockers, kitchen equipment, pre engineered metal building rework, plumbing, HVAC, Electrical, security.