Back to All Events

SB MTD Transit Center Renovation


This project consists of the following:  Overhaul an existing 15,200 sf site in downtown Santa Barbara consisting of improvements of a single story concrete block, metal and glass building with metal roofing; replacement of a concrete loading platform and driveway surface; new underground utility services and site lighting; all new landscaping; temporary facilities; and offsite improvements including new sidewalk, curb & gutter.

Plans can be obtained on Smartbid or the following link:
https://schipperconstruction.box.com/s/i8scn5hpkp53r119x55h9b8i2wjh8eyw

If you have trouble accessing the files or would like a CD or electronic set, please contact us at info@schipperconstruction.com. We will have a hard copy set of plans in our plan room

This project is  PREVAILING WAGE
MBW / WBE / DVBE Contractors are encouraged to bid

FSCC Estimator: Phil Orr (phil@schipperconstruction.com

SCOPE OF WORK:

The scope of work includes hard and soft demolition, haz mat abatement, site concrete, brick paving, landscaping, slab on grade concrete, architectural concrete, metal fabrication, rough carpentry, finish carpentry, architectural woodworking, TPO Roofing, waterproofing, metal wall panels, batten seam metal roofing, sheet metal flashing, joint sealants, doors frames hardware, overhead coiling door, storefronts / glazing, metal stud framing & drywall, plaster, tile, acoustical ceilings, carpeting, sound absorbing ceilings, painting, staining, high performance coatings, toilet partitions / accessories, fire extinguishers / cabinets, solid plastic lockers, cubicle tracks & curtains, outdoor furniture, fire sprinklers, plumbing, HVAC, electrical, fire alarm, data, communications, security.

Earlier Event: September 13
Rosewood Miramar TI
Later Event: December 5
Sunburst Winery