ADA Compliant Access at The Mission

ADA Compliant Access at The Mission

This project consisted of the construction of a fully ADA-compliant access ramp at the Mission’s primary entrance, replacing the previous indirect rear-entry route with a dignified front-door solution. The scope required careful demolition and modification of the existing stair assembly, structural adjustments to accommodate compliant slopes and landings, and precise integration with the historic façade. Special attention was given to material selection, finish matching, and detailing to ensure the new work complemented the original architecture while meeting current federal and local accessibility codes. All construction activities were phased to maintain safe public access and minimize disruption to daily
operations. The result is a durable, code-compliant improvement that enhances functionality while preserving the Mission’s historic character.

New Facility at Santa Barbara Junior High

New Facility at Santa Barbara Junior High

This project involved the demolition of an existing gymnasium and locker room and the construction of a new multi-purpose building at Santa Barbara Junior High School. The new facility was designed to support athletic, dining, and campus activities while meeting modern structural and functional requirements. The scope included extensive foundation work with deep production piles, structural concrete systems, and a flexible interior program accommodating multiple uses.